Laserfiche WebLink
QUOTE/PROPOSAL <br />CITY OF SOUTH BEND <br />PROJECT NAME Chippewa Avenue Emergency Repairs <br />PROJECT NO. 116-083F <br />QUOTES DUE October 20, 2016 —10:30 a.m. <br />QUOTER'S NAME: LaPorte Construction Co., Inc. <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Mobilization and Demobilization <br />1 <br />LS <br />I2,000 0o <br />IZj060,06 <br />2 <br />Construction Engineering <br />1 <br />LS <br />5,000,00 <br />5 000.00 <br />3 <br />Clearing Right -of -Way <br />1 <br />LS <br />IF,000.0f/ <br />18, 000, 0( <br />4 <br />Present Structure, Remove <br />Portions <br />1 <br />LS <br />57000, o0 <br />S'7, 00 0. 00 <br />5 <br />Pavement Removal <br />90 <br />SYS <br />3S, 00 <br />% ISO .00 <br />6 <br />Common Excavation <br />154 <br />CYS <br />2500 <br />5,950. 00 <br />7 <br />Dewatering <br />1 <br />LS <br />3,000.00 <br />3 000 00 <br />8 <br />Temporary Erosion and Sediment <br />Control <br />1 <br />LS <br />2,000.00 <br />2,000.06 <br />9 <br />Structure Backfill, Type 2 <br />130 <br />CYS <br />75.00 <br />% 75-0. 00 <br />10 <br />Compacted Aggregate, No. 53 <br />Base <br />43 <br />TON <br />35, 00 <br />I �rO�r,OG <br />11 <br />HMA Patching, Type B <br />37 <br />TON <br />500,00 <br />11, 100, 00 <br />12 <br />PCC Base Patching, 8 inch <br />90 <br />SYS <br />200.00 <br />I g 000.00 <br />13 <br />Milling, Asphalt Removal <br />90 <br />SYS <br />15.00 <br />1 350.00 <br />14 <br />CMA, Intermediate 11 <br />19 <br />TON <br />IZ5,00 <br />2, 3750G <br />15 <br />D-1 Contraction Joint <br />40 <br />LIT <br />16 <br />Retrofit Tie Bars <br />12 <br />EACH <br />16.Oo <br />1 %0.06 <br />17 <br />Retrofit Load Transfer <br />36 <br />EACH <br />IS.00 <br />590.06 <br />18 <br />Riprap, Class 1 <br />112 <br />TON <br />90.00 <br />`�,960.00 <br />19 <br />Riprap, Revetment <br />17 <br />TON <br />50.00 <br />850,00 <br />20 <br />Geotextile <br />177 <br />SYS <br />4,00 <br />70g.00 <br />21 <br />Sodding <br />65 <br />SYS <br />15 00 <br />1-15:00 <br />22 <br />Concrete, High Early <br />25 <br />CYS <br />I, 500.6p <br />3 Z 500, 00 <br />23 <br />Concrete, Lean <br />28 <br />CYS <br />Z00.00 <br />"i600.00 <br />Version 9/1/2016 Page - 20 Public Works Quote <br />