My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quote Opening - Chippewa Avenue Emergency Repairs Proj No. 116-083F - JCI
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Bids
>
Quote Opening - Chippewa Avenue Emergency Repairs Proj No. 116-083F - JCI
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:39:48 PM
Creation date
10/26/2016 4:03:38 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/20/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
QUOTE/PROPOSAL <br />CITY OF SOUTH BEND <br />PROJECT NAME <br />Chippewa Avenue Emergency Repairs <br />PROJECT NO. <br />116-083F <br />QUOTES DUE <br />October 20, 2016 — 10:30 a.m. <br />QUOTER'S NAME: <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Mobilization and Demobilization <br />1 <br />LS <br />'�5-00 C'" <br />2 <br />Construction Engineering <br />1 <br />LS <br />SSL'fi. ✓ <br />S�[3J.0� <br />3 <br />Clearing Right -of -Way <br />1 <br />LS <br />[� 0 �a .c c> <br />t EhSG ,00 <br />4 <br />Present Structure, Remove <br />Portions <br />1 <br />LS <br />vi7.U0 <br />Z� �u0 Q <br />5 <br />Pavement Removal <br />90 <br />SYS <br />�j_a4 <br />I YOD.L3 <br />6 <br />Common Excavation <br />154 <br />CYS <br />00 <br />5 3 9©-c7 <br />7 <br />Dewatering <br />1 <br />LS <br />H, 0e ,pp <br />q V Jay pp <br />8 <br />Temporary Erosion and Sediment <br />Control <br />1 <br />LS <br />,r p� <br />/f S�J.Do <br />9 <br />Structure Backfill, Type 2 <br />130 <br />CYS <br />q[7, Oc7 <br />,1c C, 00 <br />10 <br />Compacted Aggregate, No. 53 <br />Baset�.�-� <br />43 <br />TON <br />r <br />72,ti.J� <br />11 <br />HMA Patching, Type B <br />37 <br />TON <br />3JC a':'3 <br />12 <br />PCC Base Patching, 8 inch <br />90 <br />SYS <br />7 LOB <br />13 <br />Milling, Asphalt Removal <br />90 <br />SYS <br />�� <br />j 0Gr 614 <br />14 <br />CMA, Intermediate 11 <br />19 <br />TON <br />OO <br />y2 Z �3 <br />15 <br />D-1 Contraction Joint <br />40 <br />LFT <br />16 <br />Retrofit Tie Bars <br />12 <br />EACH <br />3 C. O© <br />17 <br />Retrofit Load Transfer <br />36 <br />EACH <br />00 <br />�dC.Oo <br />18 <br />Riprap, Class 1 <br />112 <br />TON <br />9c lt-t <br />10f ��Q tnp <br />19 <br />Riprap, Revetment <br />17 <br />TON <br />20 <br />Geotextile <br />177 <br />SYS <br />21 <br />Sodding <br />65 <br />SYS <br />3). yp <br />2 U y /, 00 <br />22 <br />Concrete, High Early <br />25 <br />CYS <br />r I d�_ co <br />27 31� t u <br />23 <br />Concrete, Lean <br />28 <br />CYS <br />I Z� O <br />3i 5-00. CO <br />Version 9/1/2016 Page - 20 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.