Laserfiche WebLink
HRP CONSTRUCTION INC. <br />QUOTE/PROPOSAL <br />CITY OF SOUTH BEND <br />PROJECT NAME Chippewa Avenue Emergency Repairs <br />PROJECT NO. 116-083F <br />QUOTES DUE October 20, 2016 — 10:30 a.m. <br />QUOTER'S NAME: HRP CONSTRUCTION INC. <br />Item <br />No. <br />Description <br />Quanti <br />Unit <br />Unit Price Total Amount <br />1 <br />Mobilization and Demobilization <br />1 <br />LS <br />I 60.OJ /� SOp, nn <br />2 <br />Construction Engineering <br />1 <br />LS <br />ct . oo /A 3cb. <br />3 <br />Clearing Right -of -Way <br />1 <br />LS <br />4 <br />Present Structure, Remove <br />S (zOo-oc 5U (atn. uo <br />Portions <br />I <br />LS <br />14 000, vo yq, ocn no <br />5 Pavement Removal <br />90 SYS <br />„ . <br />' m. ua <br />I LI LII�. on <br />6 <br />Common Excavation <br />154 <br />CYS <br />fir.. nn <br />Goo, o0 <br />7 <br />Dewatering <br />1 <br />LS <br />8 <br />Temporary Erosion and Sediment <br />/O nor . an <br />O oon. no <br />Control <br />1 <br />LS <br />Cr�;?.PO <br />c� DUr7, no <br />9 <br />Structure Backfill, Type 2 <br />130 <br />CYS <br />10 <br />Compacted Aggregate, No. 53 <br />on <br />Qo. o0 <br />Base <br />43 <br />TON <br />asoo <br />1, �7s�© <br />11 <br />HMA Patching, Type B <br />37 <br />TON <br />300. vo <br />i loo. o0 <br />12 <br />PCC Base Patching, 8 inch <br />90 <br />SYS <br />0.00 <br />'7 1CIO - no <br />13 <br />Milling, Asphalt Removal <br />90 <br />SYS <br />yp,on <br />3 oa.vo <br />14 <br />CMA, Intermediate 11 <br />19 <br />TON <br />c7•�1s. oo <br />[/ o17s. no <br />15 <br />D-1 Contraction Joint <br />40 <br />LFT <br />30. oa <br />16 <br />Retrofit Tie Bars <br />12 <br />EACH <br />y'.nn <br />ScUco <br />17 <br />Retrofit Load Transfer <br />36 <br />EACH <br />/oo , co <br />3 loon.. co <br />18 <br />Riprap, Class 1 <br />112 <br />TON <br />19 <br />Riprap, Revetment <br />17 <br />TON <br />o.ov <br />20 <br />Geotextile <br />177 <br />SYS <br />a , av <br />35y. nc� <br />21 <br />Sodding <br />65 <br />SYS <br />�• Ra5 <br />G�flr..75 <br />22 <br />Concrete, High Early <br />25 <br />CYS <br />I Io U. CAD <br />�q l00 • ors <br />23 <br />Concrete, Lean <br />28 <br />CYS <br />I58.on <br />y,acn.00 <br />Version 9/1/2016 <br />Page <br />- 20 <br />Public Works Quote <br />