1.4 In response to a Pre -Bid Meeting question from Gary Paston, Ziolkowski Construction: <br />It is the responsibility of the Contractor to position his equipment in such a way that they do <br />not damage anything within the public right of way. It will be at the cost of the Contractor to <br />replace anything damaged due to their construction activities. <br />1.5 In response to a Pre -Bid Meeting question from Gary Paston, Ziolkowski Construction: <br />Any added cost resulting from construction extending into the winter months shall be <br />incidental to the completion of this project. <br />1.6 In response to a Pre -Bid Meeting question from Gary Paston, Ziolkowski Construction: <br />Matt Douhan indicated, to the best of his knowledge, there was at least one steel fabricator <br />who could meet the deadline. MD indicated he would verify again. <br />1.7 In response to a Pre -Bid Meeting question from Gary Paston, Ziolkowski Construction: <br />The Structural concrete pad foundation is installed and ready for work required as part of this <br />Contract. Contractor is responsible for building up & backfilling site. The pad was designed <br />by the Engineer of Record for this Project. <br />1.8 In response to a Pre -Bid Meeting question from Gary Paston, Ziolkowski Construction: <br />HGR, the Owner's Contractor for the JMS Building Renovation, will coordinate efforts to <br />utilize site. Contractor shall be aware that site is constricted and a crane will not be allowed <br />to be set in the City R.O.W. <br />1.9 In response to a Pre -Bid Meeting question from Gary Paston, Ziolkowski Construction: <br />Intent for award of Contract is October 20, 2016, but at latest October 25, 2016 <br />PART 2 — SPECIAL PROVISIONS <br />2.1 SPECIAL PROVISIONS, Page 6, Section XVI.B.2, Liquidated Damages: <br />1W.110IWIJ. "XUT lu <br />a. If the Contractor shall fail to reach Final Completion prior to the Contract Date <br />established as part of Addendum #1, or extension of time granted by the Owner, <br />then the Contractor will pay to the Owner the amount for liquidated damages a <br />The JMS New North Stair Tower (116-098) Addendum # 1 <br />October 17, 2016 Page 12 <br />