My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Opening - JMS Building NEw North Stair Tower - HGR Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Bids
>
Bid Opening - JMS Building NEw North Stair Tower - HGR Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:16:41 PM
Creation date
10/26/2016 4:00:59 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/20/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
O �r <br />City of South Bend - The JMS New North Stair Tower <br />y <br />MACE <br />PROJECT NO.116-098 <br />S � <br />ADDENDUM NO. 1 <br />1861, <br />Owner: <br />City of South Bend <br />Engineer: <br />Hebard & Hebard Architects <br />Date: <br />October 17, 2016 <br />To: <br />All Plan Holders <br />From: <br />Matt Douhan, RA <br />You must acknowledge receipt of this addendum by signing the first page and <br />returning a copy with your bid. <br />This Addendum modifies the Contract Documents as follows: <br />PART 1— CLARIFICATIONS <br />PART 2 — SPECIAL PROVISIONS <br />PART 1— CLARIFICATIONS <br />1.1 Attached is the sign in sheet and meeting agenda from the Pre -bid meeting held on October <br />11, 2016. <br />1.2 In response to a Pre -Bid Meeting question from Gary Paston, Ziolkowski Construction: <br />The contractor shall pay Liquidated Damages if the Contractor shall fail to obtain a <br />Certificate of Occupancy per Special Provisions Section XVI.B.2. This is NOT the same as <br />Final Completion which includes exterior work such as EIFS. A separate Liquidated <br />Damages provision shall be defined via Addendum #1. <br />1.3 In response to a Pre -Bid Meeting question from Gary Paston, Ziolkowski Construction: <br />The warranty for the roofing material is per Section 07-53-00 and pertains ONLY to the new <br />North Stair roof, NOT the entire JMS Building installed under separate contract. <br />The JMS New North Stair Tower (116-098) Addendum # 1 <br />October 17, 2016 Page I 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.