My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 1 (Final) 2016 Tree & Stump Removal Project No. 116-016 KC Tree, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Order and Project Completion Affidavits
>
Change Order No. 1 (Final) 2016 Tree & Stump Removal Project No. 116-016 KC Tree, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:39:25 PM
Creation date
10/25/2016 3:15:23 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/25/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend Project No. 116-016 <br />Change Order No. 1 - 10118116 <br />OWNER: City of South Bend <br />ENGINEER: City of South Bend Engineering <br />Patrick C. Kerr, PhD., P.E. <br />Professional Engineer No. 10707546 <br />CONTRACTOR: KC Tree Service <br />PROJECT: 2016 Tree & Stump Removal <br />Project No. 116-016 <br />SUBJECT: Clarifications and Revisions to Contract Documents <br />ISSUE DATE: May 14, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />1. Tree & Stump removal extra quantity. <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />XVIII. Tree & Stump Removal <br />B. Additions.: <br />"Additional three (3) tree removals. <br />
The URL can be used to link to this page
Your browser does not support the video tag.