Laserfiche WebLink
57 <br />REGULAR MEETING <br />AUGUST 5, 1986 <br />The regular meeting of the Board of Public Works was convened at <br />9:34 a.m. on Tuesday, August 5, 1986, by President John E. <br />Leszczynski, with Mr. Leszczynski, Ms. Katherine G. Barnard <br />and Mr. Michael L. Vance present. -Also present was Assistant <br />City Attorney Carolyn V. Pfotenhauer and Chief Deputy City <br />Attorney Thomas Bodnar. <br />AGENDA ITEMS ADDED <br />Upon a motion made by Mr. Leszczynski, seconded by Mr. Vance and <br />carried, the following item was added to the agenda: <br />- Change Order No. 1 (Final) and Project Completion <br />Affidavit - Bendix Drive Concrete Pavement Repairs <br />Project. <br />Further, upon a motion made by Mr. Leszczynski, seconded by Ms. <br />Barnard and carried, the following item was added to the agenda: <br />Construction Contract - Cast In Place Concrete <br />(Coveleski Baseball Stadium) Project <br />APPROVE MINUTES OF PREVIOUS MEETINGS <br />Upon a motion made by Mr. Leszczynski, seconded by Ms. Barnard <br />and carried, the minutes of the July 22, 1986 regular meeting of <br />the Board were approved. Additionally, upon a motion made by Ms. <br />Barnard, seconded by Mr. Vance and carried, the minutes of the <br />regular meeting of the Board held on July 29, 1986, were <br />approved. <br />OPENING OF BIDS - AVON THEATRE BRICK VENEER PROJECT <br />This was the date set for receiving and opening of sealed bids <br />for the above referred to project. The Clerk tendered proofs of <br />publication of Notice in the South Bend Tribune and the <br />Tri-County News which were found to be sufficient. The following <br />bids were opened and publicly read: <br />CARL J. REINKE & SONS, INC. <br />1216 West Sample Street <br />P.O. Box 3095 <br />South Bend, Indiana 46619 <br />Bid was signed by Harold G. Reinke, President and Harold G. <br />Reinke, Jr., President -Secretary, Non -Collusion Affidavit was <br />in order and a 5% Bid Bond was submitted. <br />BID: $75,886.00 <br />ZIOLKOWSKI CONSTRUCTION, INC. <br />Box 1106 <br />South Bend, Indiana 46624 <br />Bid was signed by Ben Ziolkowski, President and Roberta <br />Ziolkowski, Secretary, Non -Collusion Affidavit was in order <br />and a 5% Bid Bond was submitted. <br />BID: $48,680,00 <br />Voluntary Alternate: Delete the concrete foundation <br />and install the new brick veneer wall on the existing <br />brick wall. (Located approximately 16" below sub - <br />grade). DEDUCT: $4,000.00 <br />CASTEEL CONSTRUCTION CORPORATION <br />P.O. Box 628 <br />South Bend, Indiana 46624 <br />Bid was signed by R.V. Casteel, President and Walter Renwick, <br />Secretary, Non -Collusion Affidavit was in order and a 5% Bid <br />Bond was submitted. <br />BID: $67,950.00 <br />