Laserfiche WebLink
REGULAR MEETING <br />JULY 1, 1986 <br />1-9 <br />1 <br />1 <br />H.G. CHRISTMAN CONSTRUCTION CO., INC. BID: $ 928,000.00 <br />850 South Fellows Street <br />P.O. Box 4117 <br />South Bend, Indiana <br />Bid was signed by Howard E. Emmons, President, and Arthur R. <br />Clark, Jr., Assistant Secretary, Non -Collusion Affidavit was <br />in order and a 5% Bid Bond was submitted. <br />ZIOLKOWSKI CONSTRUCTION, INC. BID: $1,080,630.00 <br />1005 South Lafayette $ 32.00 <br />P.O. Box 1106 (unit price <br />South Bend, Indiana per lin. ft. <br />piling in- <br />stalled) <br />Bid was signed by Ben Ziolkowski, President and Roberta <br />Ziolkowski, Secretary, Non -Collusion Affidavit was in order <br />and a 5% Bid Bond was submitted. <br />Upon a motion made by Mr. Leszczynski, seconded by Mr. Vance and <br />carried, the above bids were referred to the Engineering <br />Department for review and recommendation. <br />OPENING OF BIDS - DUGDALE SEWER PROJECT <br />This was the date set for receiving and opening of sealed bids <br />for the above referred to project. The Clerk tendered proofs of <br />publication of Notice in the South Bend Tribune and the <br />Tri-County News which were found to be sufficient. It was noted <br />that the Engineer's Estimate for this project is $692,836.00. <br />The following bids were opened and publicly read: <br />DYE PLUMBING & HEATING, INC. <br />3535 Monroe Street <br />LaPorte, Indiana 46350 <br />Bid was signed by Charles Prestin, Vice -President and Michael <br />F. Essling, Secretary, Non -Collusion Affidavit was in order <br />and a 5% Bid Bond was submitted. <br />BID: <br />Total Amount of Bid - Base Bid <br />Items 1 thru 37 <br />Total Amount of Bid - Alternate I <br />Items 1 thru 35 and 38 and 39 <br />Total Amount of Bid - Alternate II <br />Items 1 thru 35 and 40 and 41 <br />Total Amount of Bid with Ductile Iron Pipe <br />& Base Bid Lift Station, Items 20a to 24a <br />Total Amount of Bid with Ductile Iron Pipe <br />& Alternate I Station <br />Total Amount of Bid with Ductile Iron <br />Pipe & Alternate II Station <br />$976,088.00 <br />$965,088.00 <br />$1,066,095.00 <br />$1,053,095.00 <br />$1,045,095.00 <br />WOODRUFF & SONS, INC. <br />P.O. Box 450 <br />Michigan City, Indiana 46360 <br />Bid was signed by Frederick E. Woodruff, Vice -President and <br />Harold W. Wenzel, Assistant Secretary, Non -Collusion <br />Affidavit was in order and a 5% Bid Bond was submitted. <br />