My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/25/86 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1986
>
03/25/86 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:34:41 PM
Creation date
10/20/2016 12:01:08 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
3/25/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
J v <br />REGULAR MEETING <br />MARCH 25, 1986 <br />The regular meeting of the Board of Public Works was convened at <br />9:33 a..m. on Tuesday, March 25, 1986) _bv President John E. <br />Leszczynski, with .Mr.. Leszczynski ids. ndtneri-ne-G. P)arnarci <br />and Mr. Michael L. Vance present. Also present was Chief Deputy <br />City Attorney Thomas Bodnar. <br />APPROVE MINUTES OF PREVIOUS MEETING <br />Upon a motion made by Ms. Barnard, seconded by Mr. Vance, and <br />carried, the minutes of the March 18, 1986, regular meeting of <br />the Board were approved. <br />OPENING OF BIDS - MICHIGAN STREET IMPROVEMENTS PROJECT <br />This was the date set for receiving and opening of sealed bids <br />for the above referred to project. The Clerk tendered proofs of <br />publication of Notice in the South Bend Tribune and the <br />Tri-County News which were found to be sufficient. Mr. <br />Leszczynski advised that the Engineer's Estimate for this project <br />is $710,675.00. It was further noted that the project entails <br />the opening up of Michigan Street between Western Avenue and <br />Jefferson Boulevard. Work includes traffic signals, signaliza- <br />tion required to make Western Avenue two-way from St. Joseph <br />Street to Main Street, and new sidewalks and streets. Mr. Joseph <br />J. Pluta, Director, Division of Engineering advised that the <br />completion date for this project is June 30, 1986. The following <br />bids were opened and publicly read: <br />CASTEEL CONSTRUCTION CORPORATION <br />23086 West Ireland Road <br />South Bend, Indiana <br />Bid was signed by R. V. Casteel, President and Walter <br />Renwick, Secretary, Non -Collusion Affidavit was in order and <br />a 5% Bid Bond was submitted. <br />BASE BID: $1,081,975.00 <br />Alternate No. 1 <br />Concrete Sidewalk 41,385.00 <br />Brick Sidewalk 122,523.00 <br />Alternate No. 2 <br />Concrete Sidewalk 41,385.00 <br />Brick Sidewalk 230,267.00 <br />RIETH-RILEY CONSTRUCTION COMPANY, INC. <br />P.O. Box 1775 <br />South Bend, Indiana 46634 <br />Bid was signed by Chester L. Skwarcan, Division Manager, <br />Non -Collusion Affidavit was in order and a 5% Bid Bond was <br />submitted. <br />BASE BID: <br />Alternate No. 1 <br />Concrete Sidewalk <br />Brick Sidewalk <br />Alternate No. 2 <br />Concrete Sidewalk <br />Brick Sidewalk <br />$1,118,421.15 <br />82,770.00 <br />135,841.05 <br />63,457.00 <br />255,295.80 <br />THE ROBERT HENRY CORPORATION <br />404 South Frances Street <br />P.O. Box 1407 <br />South Bend, Indiana <br />Bid was signed by Robert A. Henry, President and Stephen R. <br />Henry, Assistant Secretary, Non -Collusion Affidavit was in <br />order and a 5% Bid Bond was submitted. <br />1 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.