My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09272016 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2016
>
09272016 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:41:21 PM
Creation date
10/12/2016 9:37:32 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
9/27/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA REVIEW SESSION SEPTEMBER 2016 299 <br />- Release of Utility Easements — Danch and Harper <br />Mr. Kerr stated this is a signing of the plat and release of City utility easements for Fire Station <br />No. 4. Be noted they are releasing a 40' line and making it a 25' sewer line. <br />- Amendments to Contracts — INDOT <br />Mr. Roger Nawrot, Engineering, stated these increases are due to site conditions. He noted they <br />will request 80% funding from INDOT and Change Order the cost depending upon how much <br />INDOT covers. <br />No other business came before the Board. Mr. Relos declared the meeting adjourned at 11:47 <br />a.m. <br />ATTEST: <br />`�inda M. Martin, Jerk <br />BOARD OF PUBLIC WORKS <br />Gary A. Gilot, PPresident <br />1Tav,id P. Re1o5 , M embe' — <br />*izabeth Member <br />The�D ro , Mcmbr <br />Jam/ A. Mueller, Member <br />REGULAR MEETING SEPTEMBER 27 2016 <br />The Regular Meeting of the Board of Public Works was convened at 9:35 a.m. on September 27, <br />2016, by Board President Gary A. Gilot, with Board Members David Relos, Elizabeth Maradik, <br />James Mueller, and Therese Doran present. Also present was Attorney Elliot Anderson. <br />APPROVE MINLTES OF PREVIOUS MEETING <br />Upon a motion made by Mr. Relos, seconded by Ms. Maradik and carried, the Minutes of the <br />Agenda Review Session, Regular Meeting and Claims Review Meeting of the Board held on <br />September 8, 2016, September 13, 2016, and September 20, 2016, were approved. <br />OPENLNG OF QUOTATIONS — REPLACEMENT LFD LUMINAIRES FOR STREET <br />LIGHTS - PROJECI NO 116-086 (COITj <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for <br />the above referenced project. The following quotation was opened and read: <br />ALL PRASE ELECTRIC SUPPLY <br />1385 N. Bendix Dr. <br />South Bend, IN 46628 <br />Quotation was submitted by: Larry Futa <br />TJON: <br />I Item No. <br />hardware <br />with <br />Upon a motion made by Mr. Relos, seconded by Ms. Maradik slid carried, the above quotation <br />was referred to the Street Department for review and recommendation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.