My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.C.(4) Proposal for professional services
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2009
>
10/23/09 Meeting
>
6.C.(4) Proposal for professional services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2009 4:11:44 PM
Creation date
10/20/2009 4:11:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
October 2009 <br />City of South Bend <br />Sketch of Boundary <br />Airport Economic Development Area Page 1 of 3 <br />APPENDIX A <br />WORK PLAN <br />PROJECT SCOPE: <br />The goal of this project is to create exhibit drawings which will allow City and County officials, as <br />well as others, to see the boundary of the AEDA relative to specific parcels of land. <br />SCOPE OF SERVICES: <br />Task #1: Sketch of Boundary <br />As discussed, the scope of services shall consist of the following: <br />a) Researching the existing plats and legal descriptions near the border of the AEDA; <br />b) Assembling plats, legal descriptions and creating exhibits <br />c) Preparing the Final Documents /Deliverables <br />Deliverables (24 x 36 and 1 1 x 17 format): <br />a) Overall map of the AEDA (to be used primarily for reference); <br />b) Detail drawings along the border of the AEDA to a scale to allow individual parcel <br />identification (approximately six maps). Attached is an example for reference. <br />ANTICIPATED SCHEDULE <br />PROPOSED COMPLETION SCHEDULE: <br />ABONMARCHE will begin work within two (2) business days after notice to proceed has been <br />provided and complete this assignment within 5 weeks. We anticipate the work to proceed as <br />follows: <br />Task Duration <br />Research 1 week <br />Exhibit Preparation 2 weeks <br />Draft for City Review 1 week <br />Deliver Final Documents 1 week <br />Engineers Architects Planners Surveyors <br />
The URL can be used to link to this page
Your browser does not support the video tag.