My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - McCormick Engineering - Bowen Street Drainage Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
PSA - McCormick Engineering - Bowen Street Drainage Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 10:00:31 AM
Creation date
9/29/2016 10:14:46 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/27/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EJCDC,,.,,, <br />ENGINEERS JOINT CONTRACT <br />DOCUMENTS COMMITTEE <br />AGREEMENT <br />BETWEEN OWNER AND ENGINEER <br />FOR <br />PROFESSIONAL SERVICES <br />THIS IS AN AGREEMENT effective as of September 16, 2016 ("Effective Date") between <br />Board of Public Works, City of South Bend, Indiana ("Owner") and <br />McCormick Engineering, LLC ("Engineer"). <br />Owner's Project, of which Engineer's services under this Agreement are a part, is generally identified as <br />follows: <br />Bowen Street Drainage Improvements ("Project"). <br />Engineer's Services under this Agreement are generally identified as follows: <br />• Prepare engineering topographic survey of site through subconsultant, including apparent utilities, <br />approximate R/W and areas of sedimentation <br />• Perform two soil test borings through subconsultant including visual classification and grain size <br />analysis <br />• Prepare up to two preliminary design concepts (10% design) of proposed Bowen Street drainage <br />improvements for final design implementation <br />• Provide a narrative of recommendations related to adjacent property drainage improvements <br />• Prepare 50% design drawings and associated estimate of cost for selected proposed improvement <br />• Prepare Contract Documents, including Plans and Specifications, in Bid Form to provide for <br />improved drainage along Bowen Street west of the Miami Street intersection. <br />• Provide a Construction Estimate for work addressed in the noted Contract Documents <br />• Provide a review of Contractor Bids and provide a recommendation based upon the lowest <br />responsive and responsible Bidder. <br />• Provide review of Contractor Shop Drawings for conformance with Contract Documents <br />• Provide Construction Administration support as required or requested by the City <br />Owner and Engineer further agree as follows: <br />Page I <br />EJCDC E-500 .Agreement Between Owner and Engineer for Professional Services <br />Copyright CC) 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.