My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - McCormick Engineering - Bowen Street Drainage Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
PSA - McCormick Engineering - Bowen Street Drainage Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 10:00:31 AM
Creation date
9/29/2016 10:14:46 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/27/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend <br />Bowen Street Drainage Improvements <br />Revision Date: 9/16/2016 <br />Manhour Estimate for McCormick Engineering Professional Services <br />Task <br />Hours <br />Rate <br />Amount <br />Topographic Survey by Abonmarche <br />N/A <br />$ <br />7,500.00 <br />Drainage Easement preparation by Abonmarche* <br />N/A <br />$ <br />1,600.00 <br />Soil Borings by Earth Exploration** <br />N/A <br />$ <br />3,000.00 <br />Subtotal - Survey and Soil Boring Subconsultant Services <br />$ 12,100.00 <br />Research of previous off site plans <br />N/A <br />Not Included <br />Review of overall watershed drainage <br />N/A <br />Not Included <br />Preliminary Drainage Design Concepts <br />16 <br />$ <br />135.00 <br />$ <br />2,160.00 <br />Narrative of Adjacent Property Improvements <br />20 <br />$ <br />135.00 <br />$ <br />2,700.00 <br />Contract Document Preparation <br />Drainage summary calculations <br />16 <br />$ <br />135.00 <br />$ <br />2,160.00 <br />Plan Preparation <br />72 <br />$ <br />135.00 <br />$ <br />9,720.00 <br />Technical Specification Preparation <br />32 <br />$ <br />135.00 <br />$ <br />4,320.00 <br />Preparation of Bid Documents <br />16 <br />$ <br />135.00 <br />$ <br />2,160.00 <br />Vendor coordination and cost estimates <br />12 <br />$ <br />135.00 <br />$ <br />1,620.00 <br />Adjacent. Property Owner Coordination <br />28 <br />$ <br />135.00 <br />$ <br />3,780.00 <br />Owner Coordination <br />16 <br />$ <br />135.00 <br />$ <br />2,160.00 <br />Construction Administration Support - Shop Drawing Review <br />8 <br />$ <br />135.00 <br />$ <br />1,080.00 <br />Construction in Floodway Permitting <br />N/A <br />Not <br />Included <br />Construction Administration Support - Progress Meetings <br />16 <br />$ <br />135.00 <br />$ <br />2,160.00 <br />Subtotal - Engineering Design Services <br />$ 34,020.00 <br />Total - Engineering Design and Survey Services <br />$ 46,120.00 <br />Note: <br />* a single drainage easement instrument is assumed <br />** a total of two sail borings not to exceed a total drillling depth of 40 feet assumed <br />
The URL can be used to link to this page
Your browser does not support the video tag.