Laserfiche WebLink
Change Order No. 24 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />OWNER: <br />City of South Bend <br />ENGINEER: <br />American Structurepoint, Inc. <br />Patrick K. Wooden, P.E. <br />Professional Engineer No. 10504741 <br />CONTRACTOR: <br />Rieth-Riley Construction <br />PROJECT: <br />South Bend One -Way to Two -Way Conversion, Division B <br />Project No. 116-001 <br />SUBJECT: <br />Additional Pavement Milling & Resurfacing <br />ISSUE DATE: <br />September 16, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />1. Add milling and HMA resurfacing on Division B, along Michigan Street between <br />Ewing Street and Sample Street, as directed by the Owner. <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />BIDDING AND CONTRACT REQUIREMENTS: <br />1. Bid/Proposal Form: <br />Division B: <br />Add 32,125 SYS to Line Item 044: MILLING, ASPHALT, 1 1/2 INCH, 32,125 SYS @ <br />$1.75/SYS for a total addition of $56,218.75 <br />Add 2811 TON to Line Item 453: HMA SURFACE TYPE C, 9.5 MM, 2811 TON @ <br />$84.26/TON for a total addition of $236,854.86 <br />SPECIFICATIONS: <br />NO CHANGE REQUIRED <br />Sheet 1 of 3 <br />