Laserfiche WebLink
/NTH `MILEY <br />Mr. Myron Cohagan <br />Lochmueller Group <br />130 South Main St. Suite 300 <br />South Bend, IN 46601 <br />RE: Division A, EWA 008: New Signal Cabinets <br />Dear Mr. Cohagan, <br />September 6, 2016 <br />Per your request, the following is Rieth-Riley's pricing for the three new traffic signal cabinets and <br />controllers as required in Change Order #21 of Division A. Please understand that the current lead time <br />for these cabinets is eight to ten weeks after approval of this pricing. As a result, additional contract time <br />may be required to perform this work. Upon approval of this change order we will release these materials <br />for manufacturing at which time we can discuss the timeline for this additional work. <br />Item # <br />Qty <br />Unit <br />Description <br />Unit Price <br />Total <br />139 <br />3 <br />EA <br />Traffic Signal Equipment, Remove <br />$1,653.00 <br />$4,959.00 <br />155 <br />2 <br />EA <br />Thermal Detection Camera <br />$4,676.50 <br />$9,353.00 <br />EWA <br />3 <br />EA <br />Controller & Cabinet, PI <br />$22,991.66 <br />$68,974.98 <br />TOTAL <br />$83,286.98 <br />I have attached all the documentation which supports this pricing. Please let me know if you have any <br />questions or require any additional information. <br />Respectfully, <br />Sc -H- Ki,s-k,>wh-i,r k, <br />Scott Kirkpatrick <br />Estimator/Project Manager <br />Rieth-Riley Construction <br />25200 5.R. 23 • SOUTH BEND, INDIANA 46614 • TELEPHONE: (574) 288-8321 • FAX: (574) 2333464 <br />