My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 5 - Rieth Riley - SB One Way to Two Way Conversion
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 5 - Rieth Riley - SB One Way to Two Way Conversion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:53:04 PM
Creation date
9/29/2016 9:41:16 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/27/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MARTELL QUOTE No.: <br />MA R TEL L <br />01-0216 <br />RE: <br />Rieth-Riley <br />CONTRAG'TCJRS 6 ENGINEERS <br />TO: <br />4601 Cleveland Road <br />South Bend, IN 46628 <br />PHONE: (574) 271-5000 <br />FAX: (574) 271-5400 <br />DATE: 8/10/16 <br />ITEM NO_ <br />QTY <br />UNIT <br />DESCRIPTION <br />UNIT <br />COST <br />TOTAL COST <br />i <br />3 <br />EA <br />NEW P1 CABINETS AND CONTROLLERS <br />20,700.00 <br />62,100.00 <br />NOTES: <br />1 <br />THIS QUOTE INCLUDES REVISIONS/ADDENDA 1 ,2 AND 3. <br />2 <br />THIS QUOTE DOES NOT INCLUDE ELECTRICAL UTILITY CHARGES <br />OF ANY TYPE. <br />3 <br />THIS QUOTE I5 BASED ON STRAIGHT TIME LABOR RATES UNLESS <br />OTHERWISE DEFINED IN SPECIFICATIONS <br />4 <br />THIS QUOTE IS CONTINGENT UPON MARTELL ELECTRIC GETTING <br />ADEQUATE TIME TO COMPLETE OUR WORK. <br />5 <br />THE ABOVE ITEMS ARE QUOTED AS A COMPLETE PACKAGE. NO <br />ITEM MAY BE DELETED WITHOUT PRIOR APPROVAL. <br />TOTAL <br />62,100.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.