My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 1 - Majority Builders - Marriott Hotel Site Development at Hall of Fame, Phase 1
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 1 - Majority Builders - Marriott Hotel Site Development at Hall of Fame, Phase 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:48:30 PM
Creation date
9/29/2016 9:37:43 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/27/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TO: Linda M. Martin, Clerk <br />Board of Public Works <br />FROM: Richard Estes, Engineer I <br />SUBJECT: Marriott Hotel Site Development at Hall of Fame, Phase 1 <br />Time extension and costs related to excavation of unsuitable materials <br />Project No. 116-021 <br />DATE: September 20, 2016 <br />Here is an explanation for the Change Order being submitted. <br />The reason(s) for the Change Order request is as follows: <br />1. The clearing of the site subgrade contained more unsuitable debris, foundations and <br />uncompacted soils than originally anticipated. New unit prices were negotiated with the <br />contractor and the method of measuring quantities was agreed upon between the City and the <br />contractor. <br />2. The building foundations and slab, item 54, unit price also included the construction of the <br />pool. It was decided by the developer and designer to delay the finishes of the pool to a later <br />phase for protection purposes during construction. The cost adjustment to item 54 is also <br />included in change order number 1. <br />The cost for the work will be $87,580.45. This represents an increase of 11.98% for the overall project <br />cost. <br />Please call me with your questions (5896). <br />
The URL can be used to link to this page
Your browser does not support the video tag.