My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/22/89 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1989
>
05/22/89 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:29:12 PM
Creation date
9/28/2016 9:38:17 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
5/22/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
145 <br />REGULAR MEETING <br />MAY 22, 1989 <br />The regular meeting of the Board of Public Works was convened at <br />9:33 a.m. on Monday, May 22, 1989, by Board President John E. <br />Leszczynski, with Mr. Leszczynski, Mrs. Patricia E. DeClercq and <br />Ms. Katherine Humphreys present. Also present was Assistant City <br />Attorney Jenny Pitts-Manier. <br />APPROVE MINUTES OF PREVIOUS MEETING <br />Upon a motion made by Mrs. DeClercq, seconded by Mr. Leszczynski <br />and carried, the minutes of the regular meeting of the Board held <br />on May 15, 1989 were approved. <br />OPENING OF BIDS - VIRIDIAN DRIVE PHASE IV PROJECT <br />This was the date set for receiving and opening of sealed bids <br />for the above referred to project. The Clerk tendered proofs of <br />publication of Notice in the South Bend Tribune and the <br />Tri-County News which were found to be sufficient. The following <br />bids were opened and publicly read: <br />KASER-SPRAKER CONSTRUCTION. INC. <br />25487 W. State Road 2 <br />P.O. Box 3605 <br />South Bend, Indiana 46619 <br />Bid was signed by Gary L. Spraker, President, Non -Collusion <br />Affidavit was in order and a 5% Bid Bond was submitted. <br />BID: $36,700.00 <br />MICHIANA PAVING_& EXCAVATING. INC. <br />705 Beiger Street <br />Mishawaka, Indiana 46544 <br />Bid was signed by Sean Watt, General Manager, Non -Collusion <br />Affidavit was in order and a 5% Bid Bond was submitted. <br />BID: $37,328.00 <br />RIETH-RILEY CONSTRUCTION COMPANY INC. <br />P.O. Box 1775 <br />South Bend, Indiana 46634 <br />Bid was signed by Kenneth G. Noble, Sales Manager, <br />Non -Collusion Affidavit was in order and a 5% Bid Bond was <br />submitted. <br />BID: $30,442.30 <br />WALSH & KELLY, INC. <br />24358 State Road 23 <br />South Bend, Indiana 46614 <br />Bid was signed by Thomas O. Walsh, President, Non -Collusion <br />Affidavit was in order and a 5% Bid Bond was submitted. <br />BID: $30,178.50 <br />Mr. Leszczynski advised that this project entails the extension <br />of Viridian Drive off of Boland Street. <br />Upon a motion made by Mr. Leszczynski, seconded by Mrs. DeClercq <br />and carried, the bids received were referred to the Engineering <br />Department for review and recommendation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.