My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quote Opening - Leighton Plaza Parking Garage Vent Pan Replacement Proj No 116-091- Dudeck
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Opening of Quotations
>
Quote Opening - Leighton Plaza Parking Garage Vent Pan Replacement Proj No 116-091- Dudeck
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:00:16 PM
Creation date
9/22/2016 1:08:24 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, ♦ t <br />0AAAZWt wfaiN!• M # 1, <br />• �. <br />PROJECT NAME: <br />PROJECT NO. <br />QUOTES DUE <br />(Must be completed for all quotes. Please type or print) <br />Date: 9/13/16 Firm. Dudeck Roofing & Sheet Metal, Inc. <br />Address: 1634 South Franklin Street 46614 <br />City/State/Zip: South Bend, IN Telephone Number: (^574) 234-7912 <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of. <br />2016*Wt'iIAJ** Leighton Plaza Parking Garage Vent Pan Replacement <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of South Bend, Department of Public Works <br />and dated 9 / 13 / 16 ] for the sum of (enter the Total Quote as shown on the Proposal) <br />Twenty Thousand Two Hundred and 00/100 (s 20,190.00 <br />(Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />B <br />Y <br />fSignature) <br />Gregory >Dudeck <br />(Printed Name of Person Signing) <br />The above quote is accepted this <br />Subject to the following conditions: <br />:w�•tts <br />•- <br />. <br />y — _...................... ---- —.. <br />Gar A. Gilot, President <br />Elizabeth A. Maradik, Member <br />James A. Mueller, Member <br />ACCEPTANCE <br />day of <br />David P. Relos, Member <br />Therese J. Dorau, Member <br />Attest: Linda M. Martin, Clerk <br />200 <br />Version 10/1/2015 Page - 7 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.