My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quote Award - Jefferson Blvd Striping Phase 1 Project No. 116-073A (2)
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Award Quotations
>
Quote Award - Jefferson Blvd Striping Phase 1 Project No. 116-073A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:33:30 PM
Creation date
9/22/2016 1:03:27 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.w' y <br />CITY OF SOUTH BEND, INDIANA, <br />CONTRACTOR'S QUOTE FOR PUBLIC WORK <br />1865 <br />PROJECT NAME: Jefferson Boulevard Striping Phase I, Eddy Street to Ironwood <br />Drive <br />PROJECT NO. 116-037A <br />QUOTES DUE September 8, 201 <br />(Must be completed for <br />quotes. Please type or <br />Date: Repremhar R,2n1fi Firm: The AimiaAring Cn ,Inc <br />Address: 1544 N. SR 25 P.O. Box 2fi <br />City/State/Zip: Roct,eister IN 46975 Telephone Number: _( 574) 223-5R17 <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor -and/or necessaryto complete the <br />public works project of: <br />Jefferson Boulevard Striping Phase I Eddy Street to Ironwood Drive <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />Abonmarche Consultants, Inc. <br />and dated August 26, 2016 for the sum of (enter the Total Quote as shown on the Proposal) <br />FITY SEVEN THOUSAND EIGHTY FOUR DOIJARS AND NO (`MS ($57,084.00 ) <br />(Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that <br />shown in the original contract if accepted by the City of South Bend. If the quote ' to be awarded on a unit basis, <br />the itemization of the units shall be shown on a separate attach nt. <br />By <br />(Signature) <br />Greg Lo e — President <br />(Printed Name of Person Signing) <br />The above quote is accepted this <br />Subject to the following <br />B ARFLU <br />W R <br />, �j u 1 <br />Gar ent <br />abeth A. Maradik, Member <br />James A. Mueller, Member <br />ACCEPTANCE <br />day of <br />200 /G <br />4-51 .6 <br />Version 10/1/2015 Page - 8 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.