Laserfiche WebLink
16.Insurance premiums for insurance coverage beyond the limits defined <br />elsewhere herein. <br />17. R/W easements. <br />18. Transportation planning and modeling. <br />19. Design of capacity modifications to the existing storm sewer trunk pipe <br />network. <br />20. Development of work/supplemental permitting resulting from coordination <br />with the USEPA regarding the St. Joseph Sole Source Aquifer. <br />21. Preparing design plans for temporary sheeting, as required. <br />22. Landscape design and plans, beyond turf restoration. <br />23. Traffic signal warrants, traffic counts at intersections and/or traffic signal <br />design. <br />24. Lighting Design and Plans. <br />25. Traffic signal modifications. <br />26. Cleaning and videotaping and evaluating the condition of the existing storm <br />sewers. <br />27. Preparing a Location Control Route Survey Plat. <br />28. Right of way services including title abstracting, right of way engineering, <br />prepare record and transfer documents for each parcel, title updates, and <br />appraisal problem analysis. <br />29. Construction Observation. <br />30. Limited Geotechnical Investigation for the Ireland Road Site. <br />31. Title Work. <br />Appendix 1, Standard Hourly Rates Schedule <br />EJCDC E-520 Short Form of Agreement Between Owner and Engineer for Professional Services. <br />Copyright 02009 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 6 <br />