Laserfiche WebLink
12 <br />REGULAR MEETING <br />FEBRUARY 26. 1990 <br />Bid was signed by Mr. Ben Ziolkowski, President, Non - <br />Collusion Affidavit was in order and a five per cent (50) Bid <br />Bond was submitted. <br />BID: <br />Total Project: <br />Alternates: <br />$497,997.00 <br />lA <br />Deduct <br />$ <br />20,637.00 <br />2A <br />Add <br />$113,246.00 <br />3A <br />Add <br />$ <br />41,912.00 <br />4A <br />Deduct <br />$ <br />27,484.00 <br />5A <br />Add <br />$ <br />9,237.00 <br />6A <br />Add <br />$ <br />6,955.00 <br />7A <br />Add <br />$ <br />2,420.00 <br />8A <br />Add <br />$ <br />11,932.00 <br />9A <br />Add <br />$ <br />38,673.00 <br />10A <br />Add <br />$ <br />3,500.00 <br />ANCON CONSTRUCTION COMPANY, INC. <br />P.O. Box 825 <br />Goshen, Indiana 46526 <br />Bid was signed by Mr. Andrew W. Frech, President, Non - <br />Collusion Affidavit was in order and a five per cent (50) <br />Bid Bond was submitted. <br />BID: <br />Total Project: <br />Alternates: <br />$458,000.00 <br />lA <br />Deduct <br />$ <br />12,000.00 <br />2A <br />Add <br />$ <br />88,000.00 <br />3A <br />Add <br />$ <br />24,000.00 <br />4A <br />Deduct <br />$ <br />17,000.00 <br />5A <br />Add <br />$ <br />8,500.00 <br />6A <br />Add <br />$ <br />5,000.00 <br />7A <br />Add <br />$ <br />1,800.00 <br />8A <br />Add <br />$ <br />14,000.00 <br />9A <br />Add <br />$ <br />40,000.00 <br />10A <br />Add <br />$ <br />2,500.00 <br />CBD SIDEWALKS AND CURBS PROJECT <br />Engineer's Estimate: $70,000.00 <br />ZIOLKOWSKI CONSTRUCTION, INC. <br />P.O. Box 1106 <br />South Bend, Indiana 46624 <br />Bid was signed by Mr. Ben Ziolkowski, President, Non - <br />Collusion Affidavit was in order and a five per cent (50) Bid <br />Bond was submitted. <br />BID: $112,271.20 <br />MICHIANA PAVING & EXCAVATING INC. <br />705 South Beiger Street <br />Mishawaka, Indiana 46545 <br />Bid was signed by Mr. Charles W. Meixel, President, Non- <br />11 <br />1 <br />