My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Christopher Burke Engineering - Chet Waggoner Court Inspection Services
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
PSA - Christopher Burke Engineering - Chet Waggoner Court Inspection Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:10:58 PM
Creation date
9/22/2016 10:49:26 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Permit Applications
Document Date
9/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
with the full knowledge and approval of Contractor. ADDADD sh.,l�llly. <br />.-deate with Ovffier- only with the luiewledge of and under the <br />2. Schedules: Review the progress schedule, schedule of Shop Drawing and <br />Sample submittals, and schedule of values prepared by Contractor and <br />consult with Owner concerning acceptability. <br />3. Conferences and Meetings: Attend meetings with Contractor, such as <br />preconstruction conferences, progress meetings, job conferences and other <br />project -related meetings, and prepare and circulate copies of minutes <br />thereof. <br />4. Liaison: <br />a. Serve as Owner's liaison with Contractor. Working principally through Contractor's <br />authorized representative or designee, assist in providing information regarding the <br />intent of the Contract Documents. <br />b. Assist Engineer in serving as Owner's liaison with Contractor when Contractor's <br />operations affect Owner's on -Site operations. <br />c. Assist in obtaining from Owner additional details or information, when required for <br />proper execution of the Work. <br />5. Interpretation of Contract Documents: Report to Owner when <br />clarifications and interpretations of the Contract Documents are needed <br />and transmit to Contractor clarifications and interpretations as issued by <br />Owner. <br />6. Shop Drawings and Samples: <br />a. Record date of receipt of Samples and approved Shop Drawings. <br />b. Receive Samples which are furnished at the Site by Contractor, and notify Owner of <br />availability of Samples for examination. <br />c. Advise Owner and Contractor of the commencement of any portion of the Work <br />requiring a Shop Drawing or Sample submittal for which RPR believes that the <br />submittal has not been approved by Owner. <br />7. Modifications: Consider and evaluate Contractor's suggestions for <br />modifications in Drawings or Specifications and report such suggestions, <br />to Owner. Transmit to Contractor in writing decisions as issued by Owner <br />8. Review of Work and Rejection of Defective Work: <br />Page 2 <br />(Exhibit D - Resident Project Representative) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.