Laserfiche WebLink
3. Services resulting from significant delays, changes, or price increases <br />occurring as a direct or indirect result of materials, equipment, or energy <br />shortages. <br />4. Additional or extended services during construction made necessary by (1) <br />emergencies or acts of God endangering the Work (advance notice not <br />required), (2) the presence at the Site of any Constituent of Concern or <br />items of historical or cultural significance, (3) Work damaged by fire or <br />other cause during construction, (4) a significant amount of defective, <br />neglected, or delayed work by Contractor, (5) acceleration of the progress <br />schedule involving services beyond normal working hours, or (6) default <br />by Contractor. <br />5. Services (other than Basic Services during the Post -Construction Phase) in <br />connection with any partial utilization of any part of the Work by Owner <br />prior to Substantial Completion. <br />6. Evaluating an unreasonable claim or an excessive number of claims <br />submitted by Contractor or others in connection with the Work. <br />7. Services during the Construction Phase rendered after the original date for <br />completion of the Work referred to in A1.05.B. <br />8. Reviewing a Shop Drawing more than three times, as a result of repeated <br />inadequate submissions by Contractor. <br />9. While at the Site, compliance by Engineer and its staff with those terms of <br />Owner's or Contractor's safety program provided to Engineer subsequent <br />to the Effective Date that exceed those normally required of engineering <br />personnel by federal, state, or local safety authorities for similar <br />construction sites. <br />Page 8 <br />(Exhibit A - Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />