Laserfiche WebLink
2. Together with Owner or Owner's representative, visit the Project within <br />one month before the end of the correction period to ascertain whether any <br />portion of the Work is subject to correction. <br />.sre............ <br />B. The Post -Construction Phase services may commence during the Construction Phase and will be <br />subject to the duration of the contract schedule as described in the duration of construction phase. <br />PART 2 —ADDITIONAL SERVICES <br />A2.01 Additional Sen4ces Requiring Owner's Written Authorization <br />A. If authorized in writing by Owner, Engineer shall furnish or obtain from others Additional <br />Services of the types listed below. <br />1. Preparation of applications and supporting documents (in addition to those <br />furnished under Basic Services) for private or governmental grants, loans, <br />or advances in connection with the Project; preparation or review of <br />environmental assessments and impact statements; review and evaluation <br />of the effects on the design requirements for the Project of any such <br />statements and documents prepared by others; and assistance in obtaining <br />approvals of authorities having jurisdiction over the anticipated <br />environmental impact of the Project. <br />2. Services to make measured drawings of or to investigate existing <br />conditions or facilities, or to verify the accuracy of drawings or other <br />information furnished by Owner or others. <br />3. Services resulting from significant changes in the scope, extent, or <br />character of the portions of the Project designed or specified by Engineer <br />or its design requirements including, but not limited to, changes in size, <br />complexity, Owner's schedule, character of construction, or method of <br />financing; and revising previously accepted studies, reports, Drawings, <br />Specifications, or Contract Documents when such revisions are required <br />by changes in Laws and Regulations enacted subsequent to the Effective <br />Date or are due to any other causes beyond Engineer's control. <br />4. Services resulting from Owner's request to evaluate additional Study and <br />Report Phase alternative solutions beyond those identified in Paragraph <br />A1.01.A.4. <br />5. Services required as a result of Owner's providing incomplete or incorrect <br />Project information to Engineer. <br />6. Providing renderings or models for Owner's use. <br />Page 5 <br />(Exhibit A - Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. AB rights reserved. <br />