My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/09/91 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1991
>
09/09/91 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:26:02 PM
Creation date
9/22/2016 9:30:59 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
9/9/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING <br />SEPTEMBER 9, 1991 <br />1 <br />I <br />1 <br />JANSMA-COURSEY ASPHALT, INC. <br />P.O. Box 139 <br />Argos, Indiana 46501 <br />Bid was signed by Mr. Douglas <br />Non -Collusion Affidavit was in <br />Commitment form was completed <br />Bid Bond was submitted. <br />BID: $60,653.90 <br />W. Coursey, President, <br />order, Non -Discrimination <br />and a five per cent ( 5 0 ) <br />KASER-SPRAKER CONSTRUCTION, INC. <br />25487 West State Road 2 <br />P.O. Box 3605 <br />South Bend, Indiana 46619 <br />Bid was signed by Mr. Gary L. Spraker, President, <br />Non -Collusion Affidavit was in order, Non -Discrimination <br />Commitment form was completed and a five per cent (5a) <br />Bid Bond was submitted. <br />BID: $67,603.25 <br />RIETH-RILEY CONSTRUCTION COMPANY, INC. <br />P,O. Box 1775 <br />South Bend, Indiana 46634 <br />Bid was signed by Mr. Kenneth G. Noble, Sales Manager, <br />Non -Collusion Affidavit was in order, Non -Discrimination <br />Commitment form was completed and a five per cent (50) <br />Bid Bond was submitted. <br />BID: $53,238.50 <br />Upon a motion made by Mr. Leszczynski, seconded by Ms. Humphreys <br />.end carried, the above bids were referred to the Engineering <br />Department for review and recommendation. <br />OPENING OF BIDS - RIVER CROSSING 1 IMPROVEMENTS PROJECT <br />This was the date set for receiving and opening of sealed bids <br />for the above referred to project. The Clerk tendered proofs of <br />publication of Notice in the South Bend Tribune and the <br />Tri-County News which were found to be sufficient. The following <br />bids were opened and publicly read: <br />WOODRUFF & SONS, INC. <br />2125 East U.S. 12 <br />P.O. Box 450 <br />Michigan City, Indiana 46360 <br />Bid was signed by Mr. John M. Milner, Field Engineer, <br />Non -Collusion Affidavit was in order, Non -Discrimination <br />Commitment form was completed and a five per cent (50) <br />Bid Bond was submitted. <br />BID: Base Bid (Items 1-19): <br />Alternate Bid (From Base Bid <br />delete items 11, 12, 13 & 15 and <br />add items 11A, 12A, 13A and 15A): <br />HRP CONSTRUCTION, INC. <br />1216-18 West Washington Street <br />P.-O. Box 266 <br />$679,969.40 <br />$695,065.40 <br />South Bend, Indiana 46624-0266 <br />Bid was signed by Mr. Paul J. Fallon, General Manager, <br />
The URL can be used to link to this page
Your browser does not support the video tag.