My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 3 - Walsh & Kelly - East Bank Sewer Sep. Phase 5
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 3 - Walsh & Kelly - East Bank Sewer Sep. Phase 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:51:50 PM
Creation date
9/21/2016 2:25:54 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend Project No. 114-062B <br />Change Order No. 3 - 09/6116 <br />OWNER: City of South Bend <br />ENGINEER: City of South Bend Engineering <br />Patrick C. Kerr, PhD., P.E. <br />Professional Engineer No. 10707546 <br />CONTRACTOR: Walsh & Kelly, Inc. <br />PROJECT: East Bank Sewer Separation - Phase 5 (Division B) <br />Project No. 114-062B <br />SUBJECT: Change Order Explanation <br />ISSUE DATE: September 6, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />Item Q�t r Unit Price Total <br />1. Structure Retrofit 1 LS $25,200 $25,200 <br />Storm structures must be retrofitted to alleviate sewer conflicts along Parry St. and Frances St. <br />All structures in this area need to be modified so invert elevations will avoid the conflict areas. <br />
The URL can be used to link to this page
Your browser does not support the video tag.