My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to PSA - David Bockover
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
Amendment to PSA - David Bockover
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 11:58:49 AM
Creation date
9/21/2016 2:01:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract Amendment No.1 <br />One Way to Two Way Conversion <br />Project No. 116-001 <br />OWNER: City of South Bend <br />CONTRACTOR: David Scott Bockover <br />PROJECT: One Way To Two Way Conversion <br />SUBJECT: Contract Amendment <br />ISSUE DATE: September 6, 2016 <br />The following is a summary and description of the revisions to the Contract. <br />The following section of the Contract Document to be revised as a result of the following change: <br />Section 3. Consideration and Terms of Payment <br />Revise the following: <br />1. Amending the original contract by $4,000.00 for inspection services due to inspection <br />contractor working longer hours including Saturdays. <br />2. Total consideration under this contract shall not exceed Twenty -Nine Thousand and No <br />Hundreths dollars($29,00.00). <br />
The URL can be used to link to this page
Your browser does not support the video tag.