My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/12/92 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1992
>
10/12/92 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:22:17 PM
Creation date
9/21/2016 10:41:50 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
10/12/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING <br />OCTOBER 12, 1992 <br />The regular meeting of the Board of Public Works was convened at <br />9:33 a.m. on Monday, October 12, 1992, by Board President John E. <br />Leszczynski; with Mr. Leszczynski, Mr. James R. Caldwell and Mrs. <br />Mary H. Mueller present. <br />AGENDA ITEM DELETED <br />There being no objections by members of the Board, a traffic <br />control device was deleted from the agenda at this time. <br />APPROVE MINUTES OF PREVIOUS MEETING <br />Upon a motion made by Mr. Caldwell, seconded by Mrs. Mueller and <br />carried, the minutes of the regular meeting of the Board held on <br />October 5, 1992, were approved. <br />OPENING BIDS - TRUSS PAINTING - COVELESKI REGIONAL STADIUM <br />This was the date set for receiving and opening of sealed bids <br />for the above referred to project. The Clerk tendered proofs of <br />publication of Notice in the South Bend Tribune and the <br />Tri-County News which were found to be sufficient. The following <br />bids were opened and publicly'read: <br />BOWEN'S DECORATING SERVICE, INC. <br />P.O. Box 274 <br />New Buffalo, Michigan 49117 <br />Bid was signed by Mr. Albert Bowen, Treasurer, Non - <br />Collusion Affidavit was in order, Non -Discrimination <br />Commitment form was completed and a five per cent (5%) <br />Bid Bond was submitted. <br />BID: $55,202.00 <br />HARMONY PAINTING <br />51855 Mayflower Road <br />South Bend, Indiana <br />Bid was signed by Mr. Thomas E. Lano, Owner, Non - <br />Collusion Affidavit was in order, Non -Discrimination <br />Commitment form was completed and a ten per cent (10%) <br />Bid Bond was submitted. <br />BID: $36,430.00 <br />ZIOLKOWSKI CONSTRUCTION, INC. <br />1005 South Lafayette Boulevard <br />P.O. Box 1106 <br />South Bend, Indiana 46624 <br />Bid was signed by Mr. Ben Ziolkowski, President, Non - <br />Collusion Affidavit was in order, Non -Discrimination <br />Commitment form was completed and a five per cent (5%) <br />Bid Bond was submitted. <br />BID: $51,057.00 <br />Upon a motion made by Mr. Leszczynski, seconded by Mrs. Mueller <br />and carried, the above bids were referred to the Division of <br />Engineering for review and recommendation. <br />OPENING OF QUOTATIONS AND AWARD - REMOVAL AND INSTALLATION OF <br />TURF - COVELESKI REGIONAL STADIUM <br />Mr. Leszczynski advised that this was the date set for the <br />receiving and opening of Quotations for the above referred to <br />project. The following Quotations were opened and read: <br />
The URL can be used to link to this page
Your browser does not support the video tag.