Laserfiche WebLink
REGULAR MEETING <br />AUGUST 3, 1992 <br />Quotation was submitted by Mr. Wincton Ake, Production <br />Superintendent. <br />QUOTATION: Standard fee to board up doors and windows is <br />$35.00 per opening with a $65.00 minimum <br />charge. <br />THOMAS GENERAL CONSTRUCTION <br />P.O. Box 11576 <br />South Bend, Indiana 46624 <br />Quotation was submitted by Mr. W.G. Thomas, Owner. <br />QUOTATION: $25.00 per window <br />$30.00 per door <br />MANVIL CONSTRUCTION <br />55425 Berry Avenue <br />South Bend, Indiana 46628 <br />Quotation was submitted by Mr. Doug Holland. <br />QUOTATION: $35.00 per window <br />$40.00 per door covering <br />With 1/2 inch exterior grade wafer board, <br />attached by 1/2 inch square head screws. <br />UNITED CONSTRUCTION, INC., OF ST. JOSEPH COUNTY <br />823 Union Street <br />Mishawaka, Indiana <br />Quotation was submitted by Mr. Tom Sowell, President. <br />QUOTATION: $15.75 per window unit <br />$19.75 per door unit <br />PAUL DAVIS SYSTEMS OF NORTHERN INDIANA <br />2630 Western Avenue <br />South Bend, Indiana 46619 <br />Quotation was submitted by Mr. Jim Rosebaum, Assoc. <br />QUOTATION: Small openings (less than 48" in width <br />and height): $19.50 <br />Windows, doors or openings that exceed <br />48" in height or width but do not exceed <br />4' x 81: $27.50 <br />There will be a minimum charge of $34.50 <br />Larger openings that may require building a frame <br />or that exceed 41x8' would be done for $1.29 a <br />square foot. <br />Upon a motion made by Mr. Leszczynski, seconded by Mr. Caldwell <br />and carried, the above bids were referred to the Department of <br />Code Enforcement for review and recommendation. <br />APPROVE SUPPLEMENTAL AGREEMENT NO. 2 - SOUTH BEND USARC EXCHANGE <br />AGREEMENT <br />Mr. Leszczynski advised that Supplemental Agreement No. 2 to the <br />Exchange Agreement approved by the Board on July 15, 1991, has <br />been submitted for approval. Board Attorney and Member Mary H. <br />Mueller advised that this Supplemental Agreement provides that <br />the Army releases their leasehold interest at the Northside Army_ <br />Reserve Center but still is responsible for environmental <br />remediation. She therefore made a motion that the Supplemental <br />Agreement be approved and executed. Mr. Caldwell seconded the <br />motion which carried. <br />