My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/06/92 Board of Public Works Special Meeting Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1992
>
07/06/92 Board of Public Works Special Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:23:41 PM
Creation date
9/21/2016 9:24:45 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
7/7/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIAL MEETING <br />'JULY 7, 1992 <br />A Special meeting of the Board of Public Works was convened at <br />9:32 a.m. on Tuesday, July 7, 1992, by Board President John E. <br />Leszczynski, with Mr. Leszczynski, Mr. James R. Caldwell and Mrs. <br />Mary H. Mueller present. <br />OPENING OF BIDS - ACOUSTIC PANEL RECOVERING - CENTURY CENTER <br />Mr. Leszczynski advised that this was the date set for the <br />receipt and opening of bids for the above referred to Century <br />Center project. The following bids were opened and read: <br />MAJORITY BUILDERS, INC. <br />62900 U.S. 31 South <br />South Bend, Indiana 46614 <br />Bid was signed by Mr. Richard E. Slagle, President. <br />BID: $41,900.00 <br />ZIOLKOWSKI CONSTRUCTION, INC._ <br />1005 South Lafayette Boulevard, Box 1106 <br />South Bend, Indiana 46624 <br />Bid was signed by Mr. Ben Ziolkowski, President. <br />BID: $9,000.00 <br />CINTAR GROUP/EMANON COMPANY <br />1715 Courtland Ct. #3 <br />Addison, Illinois <br />Bid was signed by Mr. Raymond Gillissie, Vice -President. <br />BID: $33,200.00 <br />Upon a motion made by Mrs. Mueller, seconded by Mr. Caldwell and <br />carried, the above bids were referred to Century Center for <br />review and award. <br />In response to a comment made by Mr. Leszczynski that the bid <br />submitted by Ziolkowski Construction Company was much lower than <br />the other two (2) bids received, a representative from Ziolkowski <br />Construction who was present at the meeting informed the Board <br />that their bid contained a clarifier explaining their price. <br />ADJOURNMENT <br />There being no further business to come before the Board, upon a <br />motion made by Mrs. Mueller, seconded by Mr. Leszczynski and <br />carried, the meeting adjourned at 9:34 a.m. <br />*Jh . IL <br />James R. Caldwell <br />Mary H. Muel e <br />ATT�ST: <br />Sandra M. Parmerlee, Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.