Laserfiche WebLink
REGULAR MEETING APRIL 27, 1992 <br />Mueller and carried, the above outlined bids were referred to the <br />Division of Transportation for review and recommendation. <br />OPENING OF QUOTATIONS — REROOFING AND ROOFING REPAIR - WASTEWATER <br />TREATMENT PLANT <br />Mr. Leszczynski noted that this was the date set for the <br />receiving and opening of sealed Quotations for the complete <br />reroofing of the lower roof and for repair of the upper roof at <br />the Chemical Control Building at the Wastewater Treatment Plant. <br />The following Quotations were received and read: <br />MIDLAND ENGINEERING COMPANY <br />52369 U.S. 33 North <br />P.O. Box 1019 <br />South Bend, Indiana 46624 <br />Quotation was submitted by <br />Industrial Maintenance and <br />QUOTATION: <br />Mr. Adolf Adamovsky, Manager, <br />Urethane Foam Division. <br />LOW ROOF (FIRST LEVEL): $7,535.00 <br />OPTION #1: <br />Remove two (2) large metal boxes and close decking openings <br />with heavy 14 gauge galvanized steel plates, add $1,985.00 <br />HIGH ROOF (SECOND LEVEL): <br />$ 795.00 <br />NORTH CENTRAL ROOFING INC. <br />1118 North Logan Street <br />Mishawaka, Indiana 46545 <br />Quotation was submitted by Mr. M. Mark Modlin, Vice - <br />President. <br />QUOTATION: $7,844.00 <br />Upon a motion made by Mr. Leszczynski, seconded by Mr. Caldwell <br />and carried, the above Quotations were referred to the Wastewater <br />Treatment Plant for review and recommendation. <br />APPROVE CONSTRUCTION CONTRACTS: <br />1. DEMOLITION - 1212, 1214, 1218, 1226, 1228 AND 1230 W <br />WASHINGTON <br />2. DEMOLITION - 1215 1/2, 1217-1221, 1225-1227, 1234-1236 AND <br />1237 1/2 W. WASHINGTON <br />3. ASBESTOS ABATEMENT - 1216 1237 1/2 AND 1327 1/2 W. WASHINGTON <br />4. ASBESTOS ABATEMENT - STUDEBAKER CORRIDOR RESIDENTIAL PHASE III <br />5. DEMOLITION - STUDEBAKER CORRIDOR RESIDENTIAL PHASE III <br />Mr. Leszczynski advised that Construction Contracts for the <br />following projects have been submitted for approval and exection- <br />1. DEMOLITION - 1212, 1214, 1218, 1226, 1228 AND 1230 W <br />WASHINGTON <br />CONTRACTOR: B & J EXCAVATION, INC. <br />1104 West Donald Street <br />South Bend, Indiana <br />CONTRACT AMOUNT: $35,500.00 <br />DATE AWARDED: April 13, 1992 <br />Upon a motion made by Mr. Caldwell, seconded by Mrs. Mueller <br />and carried, the Contract was approved and the appropriate <br />Performance Bond, Labor and Material Payment Bond and Certificate <br />of Insurance, as submitted, were accepted for filing. <br />2. DEMOLITION - 121 <br />1237 1/2 W. WASH <br />CONTRACTOR: <br />2, 1217-1221. 1225- <br />B & J EXCAVATION, INC. <br />7, 1234-1236 AND <br />1 <br />1 <br />