My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/20/93 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1993
>
12/20/93 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:28:22 PM
Creation date
9/20/2016 12:12:55 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
12/20/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I- <br />4uv <br />REGULAR MEETING DECEMBER 20, 1993 <br />the Board opened two (2) bids for asbestos abatement in buildings <br />to be demolished in the West Washington/South Chapin Redevelopment <br />Area. Mr. Littrell further advised that he has reviewed the bids <br />and found arithmetic errors in the bid of Specialty Systems, Inc. <br />The bid amount of the low bidder, Clean Air Systems was correct as <br />read at the Board meeting. Therefore, Mr. Littrell recommended <br />that the Board award the low bid of Clean Air Systems, Inc., 23349 <br />State Road 23 West, South Bend, Indiana, in the amount of <br />$11,837.00. <br />Additionally, Mr. Littrell noted that he has reviewed the four (4) <br />bids received on December 13, 1993 for the demolition of the above <br />referenced buildings. The amounts read at the Board meeting were <br />correct as read. Mr. Littrell recommended that the Board award <br />the low bid of Warner & Sons, Inc., P.O. Box 87, Elkhart, Indiana, <br />in the amount of $26,860.00. <br />Mr. Caldwell made a motion that these recommendations be accepted <br />and the bids be awarded. Mrs. Manier seconded the motion which <br />carried. <br />APPROVE CHANGE ORDER - LOGAN AND MISHAWAKA AVENUE PROJECT <br />Mr. Joseph Bellina, Division of Engineering, submitted to the <br />Board a Change Order for the above referred to project which <br />indicates an increase of $231.14. <br />The Change Order further indicates that at the intersection of <br />Logan and Mishawaka Avenue a width of eight feet along the east <br />curb line needed to be milled to obtain drainage, thereby <br />resulting in an increase in this project. Mr. Leszczynski made a <br />motion that this Change Order be approved. Mrs. Manier seconded <br />the motion which carried. <br />APPROVE CONTRACTORS AND EXCAVATION BONDS <br />Mr. Larry D. Spradlin, Sr., Division of Engineering, recommended <br />that the following bonds be approved: <br />EXCAVATION BOND <br />Amoco Oil Company Effective December 21, 1993 <br />CONTRACTORS BOND <br />Jerry's Concrete Work Effective December 13, 1993 <br />Mr. Caldwell made a motion that the recommendation be accepted and <br />the bonds be approved. Mrs. Manier seconded the motion which <br />carried. <br />FILING OF ENVIRONMENTAL CLEAN-UP OF LOTS REPORTS <br />Mr. Leszczynski advised that the Department of Code Enforcement <br />has submitted two (2) lists containing forty-three (43) City owned <br />and miscellaneous properties which were cleaned by the Department <br />from December 6, 1993 to December 10, 1993. Mrs. Manier, made <br />a motion that the lists as submitted be accepted for filing. Mr. <br />Caldwell seconded the motion which carried. <br />FILING OF CERTIFICATE OF INSURANCE <br />Upon a motion made by Mr. Leszczynski, seconded by Mr. Caldwell <br />and carried, a Certificate of Insurance for the following was <br />accepted for filing: <br />Warner and Sons, Inc. <br />P.O. Box 87 <br />Elkhart, Indiana <br />1 <br />I - <br />
The URL can be used to link to this page
Your browser does not support the video tag.