Laserfiche WebLink
SPECIAL MEETING DECEMBER 6, 1994 <br />G-12 Provide self supporting skylights in lieu of skylight/space frame $ 48,000.00 <br />in Rotunda D-216 <br />G-13 Delete Rooms D-101, 102, 103, 105, 106, 107, 108, 148 $120,000.00 <br />G-14 Delete demolition and construction in River Level Area E $320,000.00 <br />G-15 Perform demolition and partial construction in Meeting Rooms $ 92,000.00 <br />E-109, 112, 115, 117 <br />G-16 Delete stainless steel exterior plaque $ 10,000.00 <br />General Construction (Add) <br />G-1 Add escalator with step width of 32" $365,000.00 <br />G-17 Add white maple veneer plywood paneling on walls and doors $ 7,800.00 <br />of Vestibules D-213 and 218 <br />G-18 Add escalator with step width of 24" $358,000.00 <br />Mechanical Construction (Deduct) <br />M-1 Provide standard pneumatic controls in lieu of direct $ 28,000.00 <br />digital controls <br />M-2 Delete VAV boxes with AHU's 11 and 12 and revise controls $ 19,500.00 <br />M-3 Associated cost for Alternate M-2 if M-1 is accepted $ 34,000.00 <br />M-4 Delete humidification system with AHU-13 $ 3,060.00 <br />M-5 Provide Barber Coleman pneumatic controls in lieu NO BID <br />of Johnson Controls <br />Electrical Construction (Deduct <br />E-1 Delete communication conduit from Storage E-119 to $ 17,000.00 <br />Building "B" <br />E-2 Delete 208V twist lock outlets in Meeting Rooms A,B,C,D $ 1,700.00 <br />E-3 Delete all sound system rough -ins $ 2,300.00 <br />E-4 Delete VISA wall sconces $ 8,100.00 <br />E-5 Delete dimmer system rough -ins and provide switches $ 11,500.00 <br />E-6 Delete downlight at top of skylight in Rotunda D-216 $ 1,150.00 <br />E-7 Delete exterior walkway lights along west wall of Street $ 4,100.00 <br />Level Area "D" <br />All work can be completed in the River Level Area E by September 20, 1995, and all remaining <br />work can be completed by October 31, 1995. <br />