REGULAR MEETING NOVEMBER 21,1994
<br />floor redone; 4) door latches broken; 5) squad bench too high 6) no insulation in conversion; just to
<br />mention a few. Construction features are not the same and clarifications furnished at time of
<br />proposal are not stated. Various conversations with Southern have raised questions and concerns
<br />with the ambulance. They state their normal construction and what they are willing to do to meet
<br />specifications. The Fire Department believes that an ambulance built should be a normal type
<br />conversion for the company and not "we can do it".
<br />The bid of $112,340.00 from Excellance, Inc., 453 Lanier Road, Madison, Alabama, was the hig
<br />bid, and the bid of $99,968.00 as an alternate does not meet specifications in many areas. The Fir
<br />Department feels that its specifications will give the City of South Bend the ambulance that will _
<br />service the citizens with the comfort and service they expect.
<br />Therefore, Mrs. Manier made a motion that the recommendation be accepted and the bid be awarded
<br />as outlined above. Mr. Caldwell seconded the motion which carried.
<br />CLARIFICATION OF BID AWARD - INDUSTRIAL CONSTRUCTION EQUIPMENT -
<br />VIBRATORY ASPHALT COMPACTOR
<br />Mr. Leszczynski noted that Mr. Matthew L. Chlebowski, Director, Equipment Services, has
<br />submitted a clarification of a bid awarded to Industrial Construction Equipment Co., 25166 W. State
<br />Road #2, South Bend, Indiana, for the above referred to equipment. The bid was awarded on
<br />October 10, 1994. Mr. Chlebowski stated that the trade-in amount of $7,300.00 was incorrect. The
<br />correct trade-in amount is $3,500.00, bringing the net total to $72,000.00, instead of $68,200.00 as
<br />stated in the bid award. It should be noted that this increase does not change the order of bids.
<br />Therefore, Mrs. Manier made a motion to approve the correction. Mr. Caldwell seconded the motion
<br />which carried.
<br />MOTORIZED PUMPING FIRE APPARATUS
<br />Mr. Leszczynski advised that in accordance with the bid awarded on November 7, 1994, to Pierce
<br />Manufacturing Inc., 2600 American Drive, Appleton, Wisconsin„ in the amount of $245,345.11 for
<br />the above referred to equipment, a Contract in said amount was being submitted for Board approval.
<br />Upon a motion made by Mr. Caldwell, seconded by Mrs. Manier and carried, the Contract was
<br />approved.
<br />AWARD QUOTATION - ASBESTOS FLOOR TILE AND MASTIC REMOVAL - CENTURY
<br />CENTER - PROJECT NO. 94-84
<br />Mr. Carl P. Littrell, Director, Division of Engineering, advised the Board that on November 7, 1994,
<br />quotations were received and opened for the above referred to project. After reviewing those bids,
<br />Mr. Littrell recommends that the Board award the contract to Specialty Systems of South Bend,1408
<br />Elwood Avenue, South Bend, Indiana, in the amount of $2,422.00. Therefore, Mrs. Manier made
<br />a motion that the recommendation be accepted and the quotation be awarded as outlined above. Mr.
<br />Caldwell seconded the motion which carried.
<br />APPROVE COMMUNITY DEVELOPMENT ADDENDUM II
<br />The following Community Development Addendum II was presented to the Board for approval:
<br />Division of Planning and Neighborhood Development - Neighborhood Partnerships Progr
<br />- CD94-302 - l/l/94 through 12/31/95 - This Addendum to 1994 Partnerships Program
<br />allows for special activities to be undertaken by Neighborhood organizations.
<br />Upon a motion made by Mr. Caldwell, seconded by Mrs. Manier and carried, the above referred to
<br />Addendum was approved and executed.
<br />APPROVAL OF RECOMMENDATION TO ENCROACH ONTO PUBLIC RIGHT-OF-WAY -
<br />INSTALLATION OF THREE (3) FABRIC AWNINGS AT BENCHWARMERS SPORTS BAR
<br />236 SOUTH MICHIGAN, SOUTH BEND, INDIANA
<br />Mr. Leszczynski noted that the Board is in receipt of favorable recommendations from the Division
<br />of Engineering, Police Department, Building Commissioner, and the Redevelopment Design Review