Laserfiche WebLink
1 <br />u <br />u <br />REGULAR MEETING <br />JUNE 27, 1994 <br />TOROK EXCAVATING & DEMOLITION, INC. <br />54195 North Burdette <br />South Bend, Indiana 46637 <br />Bid was signed by Mr. Bill Torok, President, Non -Collusion <br />Affidavit was in order, Non -Discrimination Commitment form <br />was completed and a Cashier's Check in the amount of <br />$3,500.00 was submitted. <br />BID: $69,183.00 <br />RITSCHARD BROTHERS, INC. <br />1204 West Sample Street <br />South Bend, Indiana 46619 <br />Bid was signed by Mr. Carmelo Ritschard, President, Non - <br />Collusion Affidavit was in order, Non -Discrimination <br />Commitment form was completed and a five per cent (5%) Bid <br />Bond was submitted. <br />BID: $203,885.00 <br />Upon a motion made by Mrs. Manier, seconded by Mr. Caldwell and <br />carried, the above outlined bids were referred to the Division of <br />Engineering for review and recommendation. <br />- ONE, OR MORE, VIBRATORY ASPHALT COMPACTORS <br />- ONE, OR MORE, HYDRAULIC BUCKET MACHINES <br />- ONE, OR MORE, SEWER TV INSPECTION SYSTEMS <br />- ONE, OR MORE, JET RODDER/VACUUM MACHINES <br />- TWO, MORE OR LESS, 20 YARD PACKER CAB/CHASSIS <br />his was the date set for receiving and opening of sealed bids for <br />he above referred to equipment. The Clerk tendered proofs of <br />u�lication of Notice in the South Bend Tribune and the Tri-County <br />e s which were found to be -sufficient. <br />It <br />to <br />was noted that the following vendors advised that they decline <br />bid at this time: <br />1. Carlisle Equipment Company, Inc. <br />7255 West Washington Street <br />Indianapolis, Indiana 46241 <br />2. Scranton Manufacturing Company, Inc. <br />P.O. Box 336 <br />Scranton, Iowa 51462 <br />following bids were opened and publicly read: <br />BROWN EQUIPMENT COMPANY, INC. <br />P.O. Box 9799 <br />Fort Wayne, Indiana <br />Bid was signed by Mr. Douglas W. Brown, President, Non - <br />Collusion Affidavit was in order, Non -Discrimination <br />Commitment form was completed and a ten per cent (10%) Bid <br />Bond was submitted. <br />BID: $98,950.00 <br />One (1) 1994 Chevrolet P Commercial Cutaway with Utilimaster <br />14' x 616" Utilivan as specified. <br />Delivery: 60-90 days after receipt of chassis/van at BEC. <br />Options: Chassis air conditioning: Add $ 950.00 <br />Straight mainline camera <br />