Laserfiche WebLink
J 337 <br />1 <br />1 <br />REGULAR MEETING <br />JUNE 13, 1994 <br />submitted a lump sum bid and failed to provide unit prices for <br />each item and was therefore not considered for recommendation. <br />Therefore, Mr. Littrell recommended that the Board award the low <br />bid of Ziolkowski Construction, Inc., P.O. Box 1106, South Bend, <br />Indiana, in the amount of $43,409.85. Mr. Littrell noted that the <br />Department of Community and Economic Development concurs with this <br />recommendation. <br />Additionally, Mr. Littrell advised that on May 23, 1994, the Board <br />opened four (4) bids for the Stephenson Mill Apartments Site <br />Development Project. Mr. Littrell noted that he has reviewed the <br />bids and found the amounts correct as read at the Board meeting. <br />One of the bidders, Small, Inc., placed qualifications on the bid. <br />However, Mr. Littrell found that the qualifications were still <br />responsive to the specifications and did not alter the work the <br />specifications were intended to construct. Therefore, Mr. <br />Littrell recommended that the Board award the lowest bid submitted <br />by HRP Construction, Inc., P.O. Box 266, South Bend, Indiana, in <br />the amount of $216,264.00. It is noted that the Department of <br />Community and Economic Development concurs with this <br />recommendation. <br />Mr. George S. Zana, Purchasing Manager, Division of Equipment <br />Services, advised members of the Board that based on the review of <br />bids received on July 6, 1994, for paint supplies, he recommends <br />that the Board award the bid of Sherwin Williams Company, 1220 <br />South Main Street, South Bend, Indiana, in the amount of $6,639.08 <br />for the fifty-eight (58) items they bid. The four (4) items not <br />bid are covered by substitutable products in the items bid. The <br />only other bidder was C.E. Lee Company with a bid of $8,459.40 for <br />all sixty-two (62) items. Eliminating the four (4) items not bid <br />by Sherwin Williams, a comparative amount is $8,313.00 for the <br />fifty-eight (58) items awarded. <br />Finally, Mr. Matthew L. Chlebowski, Director, Division of <br />Equipment Services, recommended that the Board award the low bid <br />of Industrial Construction Equipment Company, 25166 West State <br />Road #2, South Bend, Indiana, in the amount of $9,115.00 for one <br />(1) 185 CFM Ingersoll-Rand Air Compressor for use by the City <br />Street Department. Bids for this Compressor were opened by the <br />Board on May 2, 1994. <br />Mrr. Leszczynski made a motion that the recommendations received <br />from Mr. Littrell, Mr. Zana and Mr. Chlebowski be accepted and <br />approved. Mr. Caldwell seconded the motion which carried. <br />OVE TRAFFIC CONTROL DEVICE <br />a motion made by Mr. Caldwell, seconded by Mr. Leszczynski <br />carried, the following one (1) traffic control device was <br />oved: <br />REMOVAL OF: <br />LOCATION: <br />REMARKS: <br />TITLE <br />Handicap Parking Space <br />1014 Campeau <br />Mr. Rudy Mc Dougal is moving and the <br />signs are no longer needed <br />BLACKTHORN GOLF COURSE WETLAND PLANTINGS <br />MAYFLOWER SECTION 8 (SEWER/WATER/STREET) <br />NIMTZ PARKWAY LANDSCAPING - AIRPORT 2010 DEVELOPMENT AREA <br />2U�on a motion made by Mr. <br />a d carried, Title Sheets <br />approved and signed. <br />Leszczynski, seconded by Mr. Caldwell <br />for the above referred to projects were <br />