My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-12-16 Council Packet and Agenda
sbend
>
Public
>
Common Council
>
Common Council Agenda Packets
>
2016
>
09-12-16 Council Packet and Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 10:44:34 AM
Creation date
9/8/2016 2:10:50 PM
Metadata
Fields
Template:
City Council - City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t UFO As a soon -to-be 3rd generallon famly owned business, current and future leadership is Invesligagng gtegrovrfit a6hily o f <br />ern ourtacAkies industrial Metes -Fab is a lull service metal fabrkator and we empty higNy Vabred operetoro fn the proc6asea. <br />i e ry of CNC prollting, forming, welding and machining. We sell to andosbies in the easrgy, ednstnrcfion and agriculture fields, to <br />e r name a.few. We expect to slow with these industries over the coming yeas, <br />f „ Our 3g,0W so manufacturing space is divided between 2 bulidMgs. There is another 8,500 sqR of pole tam storage <br />currently used to house our ektenstve plats meal inventory. Our pdmsry ccncem is iha Inability to easily add manufacturing <br />special this landlocked aria (raliroad props and the soulFt and businesses to the East and West). Our only prospect for <br />r z more manufacturing space Is In the area now consumed by the pole turn storage building. <br />:a <br />Project Summary: <br />- <br />1.1 Pave the area between our buildings to manage water dlainage and' degradation of building foundalions. Prep ibis area <br />forstsp 1.2 d 2. <br />1.2 install new cantilever rackbr8.aiong unused aide of main manufacturing building. This would allow us to evacuate the <br />pole barn of the plate steel and relocate Its storage to these new racks. This presents us wish a more efltclem storage <br />lnelhod to about 30% of the sqR space. <br />2. When needed, build 6,5W sqR of new manufacturing space (steel building) to houa newlas procoape s to <br />aca <br />vte jobs and grow the business. x' <br />�y11 1 1 t n 0181'k`8 0 108 <br />We bellive this will q: tend our dfespen at this fe,cilky by 10-15 years. <br />uil ems eaaroio�V,rlri4AwpFl to CAD tl.A r?nif <br />>°» NO <br />NQ i CLTY CLERK, SOUTH BPND, IN <br />, <br />t <br />Information Project Narne <br />General <br />7TY i 3sltZi�' INID1,19TRIAL <br />Project Number <br />ttt ` PRIVATELY 0 <br />Project Information <br />�Proposed <br />OTT <br />Primary Contact Information <br />ttr <br />t UFO As a soon -to-be 3rd generallon famly owned business, current and future leadership is Invesligagng gtegrovrfit a6hily o f <br />ern ourtacAkies industrial Metes -Fab is a lull service metal fabrkator and we empty higNy Vabred operetoro fn the proc6asea. <br />i e ry of CNC prollting, forming, welding and machining. We sell to andosbies in the easrgy, ednstnrcfion and agriculture fields, to <br />e r name a.few. We expect to slow with these industries over the coming yeas, <br />f „ Our 3g,0W so manufacturing space is divided between 2 bulidMgs. There is another 8,500 sqR of pole tam storage <br />currently used to house our ektenstve plats meal inventory. Our pdmsry ccncem is iha Inability to easily add manufacturing <br />special this landlocked aria (raliroad props and the soulFt and businesses to the East and West). Our only prospect for <br />r z more manufacturing space Is In the area now consumed by the pole turn storage building. <br />:a <br />Project Summary: <br />- <br />1.1 Pave the area between our buildings to manage water dlainage and' degradation of building foundalions. Prep ibis area <br />forstsp 1.2 d 2. <br />1.2 install new cantilever rackbr8.aiong unused aide of main manufacturing building. This would allow us to evacuate the <br />pole barn of the plate steel and relocate Its storage to these new racks. This presents us wish a more efltclem storage <br />lnelhod to about 30% of the sqR space. <br />2. When needed, build 6,5W sqR of new manufacturing space (steel building) to houa newlas procoape s to <br />aca <br />vte jobs and grow the business. x' <br />�y11 1 1 t n 0181'k`8 0 108 <br />We bellive this will q: tend our dfespen at this fe,cilky by 10-15 years. <br />uil ems eaaroio�V,rlri4AwpFl to CAD tl.A r?nif <br />>°» NO <br />NQ i CLTY CLERK, SOUTH BPND, IN <br />
The URL can be used to link to this page
Your browser does not support the video tag.