My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/06/94 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1994
>
01/06/94 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:28:53 PM
Creation date
9/8/2016 12:02:48 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
1/6/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 � ? 4 <br />SPECIAL MEETING <br />JANUARY 6, 1994 <br />Affidavit was in order, Non -Discrimination Commitment form <br />was completed and a five per cent (5%) Bid Bond was <br />submitted. <br />BID: $830,000.00 <br />Calendar Days: 224 <br />Per Schedule: YES <br />Alternate #6: NC <br />BID PACKAGE # 07.10 <br />WATERPROOFING <br />MIDLAND ENGINEERING COMPANY, INC. <br />52369 U.S. 33 North <br />South Bend, Indiana 46637 <br />Bid was signed by Mr. Charles W. Frazier, President, Non - <br />Collusion Affidavit was in order, Non -Discrimination <br />Commitment form was completed and a five per cent (5%) Bid <br />Bond was submitted. <br />BID: $182,720.00 <br />Calendar Days: <br />Per Schedule: YES <br />Alternate #1: Add $ 8,375.00 <br />Alternate #2: Deduct $42,730.00 <br />Section 07160: Hot fluid -applied waterproofing at Plaza <br />Deck and over top of tunnel (per Addendum 1) <br />Alternate #14: Add $61,155.00 <br />Section 07170 - Hot fluid -applied waterproofing at <br />vertical surfaces of walls and footings for building <br />and tunnel (per Addendum 1) <br />Alternate #15: Add $102,000.00 <br />JARNAGIN ENTERPRISES, INC. <br />6249 Hickory Road <br />Indianapolis, Indiana 46259 <br />Bid was signed by Mr. W. Nicholas Jarnagin, President, Non - <br />Collusion Affidavit was in order, Non -Discrimination <br />Commitment form was completed and a five per cent (5%) Bid <br />Bond was submitted. <br />BID: $166,000.00 <br />Calendar <br />Days: <br />Per Schedule: <br />YES <br />Alternate <br />41: <br />Add <br />$10,600.00 <br />Alternate <br />#2: <br />Deduct <br />$41,000.00 <br />Alternate <br />#14: <br />Add <br />$65,600.00 <br />Alternate <br />#15: <br />Add <br />$67,600.00 <br />SLATILE ROOFING & SHEET METAL <br />1703 South Ironwood Drive <br />South Bend, Indiana 46613 <br />Bid was signed by Mr. Gerald Longerot, President, Non - <br />Collusion Affidavit was in order, Non -Discrimination <br />Commitment form was completed and a five per cent (5%) Bid <br />Bond was submitted. <br />BID: $167,504.00 <br />Calendar Days: <br />Per Schedule: YES <br />
The URL can be used to link to this page
Your browser does not support the video tag.