Laserfiche WebLink
REGULAR MEETING AUGUST 7, 1995 <br />TOTAL $12,922.16 <br />NOTE: If total bid is taken, deduct $748.10 <br />BUSINESS SYSTEMS, INC. <br />3618 Grape Road <br />Mishawaka, Indiana 46545 <br />Bid was signed by Mr. Thomas Tucker <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Ten per cent (10%) Bid Bond was submitted <br />BID: <br />Division 1 <br />$ 6,130.50 <br />Division 2 <br />$ 1,912.00 <br />Division 3 <br />NO BID <br />Division 4 <br />$ 2,854.00 <br />TOTAL <br />$10,896.50 <br />SPB ENTERPRISES INC <br />15834 S. Lakeshore Drive <br />Granger, Indiana 46530 <br />Bid was signed by Ms. Sandra P. Barry <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Ten per cent (10%) Bid Bond was submitted <br />Division 1 <br />$ 8,401.86 <br />Division 2 <br />$ 1,393.92 <br />Division 3 <br />$ 1,007.84 <br />Division 4 <br />$ 2,490.81 <br />TOTAL <br />$13,294.43 <br />It was noted that the bid received from GranDesign, 1352 Lincolnway East, South Bend, Indiana, <br />was rejected, as no bid bond was included. Upon a motion made by Mr. Caldwell, seconded by Mr. <br />Leszczynski and carried, the bid was rejected. <br />Upon a motion made by Mr. Caldwell, seconded by Mr. Leszczynski and carried, the above bids <br />were referred to Mr. Bernard Kish, College Football Hall of Fame, for review and recommendation. <br />AWARD BID - WASHINGTON AVENUE AT CIRCLE AVENUE IMPROVEMENTS - <br />PROJECT NO.95-63 <br />Mr. Carl P. Littrell, Director, Division of Engineering, advised the Board that on July 31, 1995, bids <br />were received and opened for the above referred to project. After reviewing those bids, Mr. Littrell <br />recommends that the Board award the contract to the lowest bidder, Kaser-Spraker Construction, <br />Inc., 25487 W. State Road 2, South Bend, Indiana, in the amount of $14,777.00. Therefore, Mr. <br />Caldwell made a motion that the recommendation be accepted and the bids be awarded as outlined <br />above. Mr. Caldwell seconded the motion which carried. <br />AWARD BID - TWO (2) TWO TON VIBRATORY ROLLERS <br />Mr. Matthew Chlebowski, Director, Division of Equipment Services, advised the Board that on July <br />24,1995, bids were received and opened for the above referred to equipment. After reviewing those <br />bids, Mr. Chlebowski recommends that the Board award the contract to the low bidder, Deeds <br />