My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/03/95 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1995
>
07/03/95 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:23:30 PM
Creation date
9/8/2016 10:00:57 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
7/3/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING JULY 3, 1995 <br />Quotation was submitted by Mr. James Marnocha, President <br />QUOTATION: $4,950.00 <br />Upon a motion made by Mrs. Manier, seconded by Mr. Leszczynski and carried, the above <br />Quotation was referred to the Division of Engineering for review and recommendation. <br />OPENING OF QUOTATIONS - STUDEBAKER NATIONAL MUSEUM - CONCRETE <br />PATCHING <br />Mr. Leszczynski advised that this was the date set for the receiving and opening of sealed Quotations <br />for the above referred to project. The following Quotations were opened and read: <br />KASER SPRAKER CONSTRUCTION. INC. <br />25487 West State Road 2 <br />South Bend, Indiana 46619 <br />Quotation was submitted by Mr. Joe Winters, Project Manager <br />QUOTATION: <br />Patch all beams longer than four (4) feet using epoxy bonding <br />and epoxy grout $19,906.00 <br />Epoxy bonding with Speedcrete $13,290.00 <br />For beams less than four (4) feet, apply epoxy $ 3,500.00 <br />And apply Speedcrete $ 3,200.00 <br />Beam patching seven (7) locations on second floor <br />level to be patched with epoxy application $ 1,371.00 <br />And apply Speedcrete $ 924.00 <br />After all areas have been considered, a total amount for <br />using an epoxy application is $24,777.00 compared to <br />$17,414.00 for using a Speedcrete application <br />Upon a motion made by Mr. Leszczynski, seconded by Mrs. Manier and carried, the above <br />Quotation was referred to the Division of Engineering for review and recommendation. <br />AWARD BID - ONE (1) SINGLE AXLE DUMP TRUCK <br />Mr. Matthew Chlebowski, Director, Division of Equipment Services, advised the Board that on June <br />19, 1995, bids were received and opened for the above referred to equipment. After reviewing those <br />bids, Mr. Chlebowski recommends that the Board award the contract to Wise International Trucks, <br />4849 West Western, South Bend, Indiana, in the amount of $57,104.00. Therefore, Mrs. Manier <br />made a motion that the recommendation be accepted and the bid be awarded as outlined above. Mr. <br />Leszczynski seconded the motion which carried. <br />AWARD BID - TWO (2) 15.000 LB. GVW DUMP TRUCKS <br />Mr. Matthew Chlebowski, Director, Division of Equipment Services, advised the Board that on June <br />19, 1995, bids were received and opened for the above referred to equipment. After reviewing those <br />bids, Mr. Chlebowski recommends that the Board award the contract to Gates Chevrolet, 401 South <br />Lafayette, South Bend, Indiana, in the amount of $63,522.00. Therefore, Mrs. Manier made a <br />motion that the recommendation be accepted and the bid be awarded as outlined above. Mr. <br />Leszczynski seconded the motion which carried. <br />
The URL can be used to link to this page
Your browser does not support the video tag.