Laserfiche WebLink
5 <br />REGULAR MEETING APRIL 15. 1996 <br />AWARD BID - 1996 STREET MATERIALS <br />Mr. Carl P. Littrell, Director, Division of Engineering, advised <br />the Board that on April 1, 1996, bids <br />were <br />received and opened for the above referred to materials. <br />After reviewing those bids, Mr. <br />Littrell recommends that the Board award the bids as follows: <br />No. <br />Item <br />Quanti1y <br />Unit Price <br />Vendor <br />1 a <br />HAC Surface No. 11 <br />2,000 Ton <br />$ <br />19.90 <br />Rieth Riley <br />lb <br />HAC Surface No. 11 HV <br />1,000 Ton <br />$ <br />27.25 <br />Rieth Riley <br />lc <br />HAC Surface No. 9 <br />1,000 Ton <br />$ <br />19.75 <br />Rieth Riley <br />Id <br />HAC Surface No. 9 Slag <br />1,000 Ton <br />$ <br />20.25 <br />Rieth Riley <br />le <br />HAC Surface No. 11 Slag <br />20,000 Ton <br />$ <br />20.20 <br />Rieth Riley <br />1 f <br />HAC Surface No. 11 Slag <br />10,000 Ton <br />$ <br />27.45 <br />Rieth Riley <br />lg <br />HAC Binder No. 8 or 9 <br />3,000 Ton <br />$ <br />18.25 <br />Rieth Riley <br />lh <br />HAC Binder No. 11, MV <br />8,000 Ton <br />$ <br />18.95 <br />Rieth Riley <br />1 i <br />HAC Base No. 51), MV <br />5,000 Ton <br />$ <br />18.25 <br />Rieth Riley <br />lj <br />Bituminous Patch, WS <br />600 Ton <br />$ <br />28.65 <br />Rieth Riley <br />lk <br />Bituminous Patch, AE300S <br />600 Ton <br />$ <br />33.95 <br />Rieth Riley <br />2 <br />Bituminous Material, Tack <br />200 Ton <br />$165.00 <br />Koch Minerals <br />3 <br />Bituminous Material, Dust Palative <br />20,000 Gal. <br />$ <br />.47 <br />Koch Minerals <br />4 <br />Polymer Bond, Asph. Emulsions <br />50,000 Gal. <br />$ <br />.83 <br />Koch Minerals <br />5 <br />6 <br />Polymer Modified Asph. Cement <br />Polymer Modified Asph. Cement <br />20,000 Gal. <br />40,000 Gal. <br />$ <br />$ <br />.93 <br />.95 <br />Koch Minerals <br />Koch Minerals <br />7 <br />Coarse Agg. No. 73 Stone or Slag <br />5,000 Ton <br />$ <br />8.09 <br />The Levy Co. <br />8 <br />Course Agg. No. 53 Stone or Slag <br />5,000 Ton <br />$ <br />8.04 <br />The Levy Co. <br />9 <br />Mineral Agg. No. 2 Stone or Slag <br />3,000 Ton <br />$ <br />7.69 <br />The Levy Co. <br />10 <br />Course Agg. No. 73- Gravel <br />5,000 Ton <br />$ <br />4.91 <br />The Levy Co. <br />11 <br />Course Agg. No. 53 - Gravel <br />5,000 Ton <br />$ <br />4.91 <br />The Levy Co. <br />12 <br />Fine Agg. No. 23, Sand <br />1,500 Ton <br />$ <br />3.80 <br />St. Jos Materials <br />13 <br />Fine Agg. No. 24, Sand <br />1,500 Ton <br />$ <br />3.80 <br />St. Jos Materials <br />14 <br />Course Agg. No. 9 Mixture <br />1,000 Ton <br />$ <br />6.95 <br />St. Jos Materials <br />15 <br />Portland Cement, 47 lb. <br />3,000 Bags <br />$ <br />3.40 <br />Rose Fuel <br />16 <br />Portland Cement, 94 lb. <br />1,500 Bags <br />$ <br />5.70 <br />Rose Fuel <br />17 <br />Quick Setting Cement, 50 lb. <br />200 Bags <br />$ <br />11.30 <br />Rose Fuel <br />Therefore, Mr. Caldwell made a motion that the recommendation be accepted and the bids be <br />awarded as outlined above. Mrs. Manier seconded the motion which carried. <br />AWARD BID - SAMPLE EWING REDEVELOPMENT AREA SITE CLEARANCE PHASE II - <br />STRUCTURE REMOVAL PACKAGE 2 - PROJECT NO 96-15-2 <br />Mr. Carl P. Littrell, Director, Division of Engineering, advised the Board that on April 8, 1996, bids <br />were received and opened for the above referred to project. After reviewing those bids, Mr. Littrell <br />recommends that the Board award the contract to Bradberry Brothers, 20061 West Dice Street, South <br />Bend, Indiana, in the amount of $27,005.00. Funding from this project will come from the Sample - <br />Ewing TIF Fund 414. Therefore, Mrs. Manier made a motion that the recommendation be accepted <br />and the bid be awarded as outlined above. Mr. Caldwell seconded the motion which carried. <br />APPROVE CONSTRUCTION CONTRACT - HVAC UPGRADE - ADMINISTRATION <br />BUILDING - WWTP - PROJECT NO.94-19 <br />Mr. Leszczynski advised that in accordance with the bid awarded on April 1, 1996, to Herman & <br />Goetz, Inc., 225 South Lafayette Boulevard, South Bend, Indiana, in the amount of $130,385.00 for <br />the above referred to project, a Contract in said amount was being submitted for Board approval. <br />Upon a motion made by Mrs. Manier, seconded by Mr. Caldwell and carried, the Contract was <br />