REGULAR MEETING SEPTEMEER 15, 1997 <br />AWARD BID - OHIO STREET- MICHIGAN TO CARROLL - SIDEWALK CURB AND <br />APPROACH AND PAVEMENT REPAIRS - PROJECT NO. 97-36 <br />Mr. Carl P. Littrell, Director, Division of Engineering, advised the Board that on September 8, 1997, <br />bids were received and opened for the above referred to project. After reviewing those bids, Mr. <br />Littrell recommends that the Board award the contract to Rieth Riley Construction Co., Inc., Post <br />Office Box 1775, South Bend, Indiana in the amount of $89,178.85. Therefore, Ms. Roemer made <br />■ a motion that the recommendation be accepted and the bid be awarded as outlined above. Mr. Littrell <br />seconded the motion which carried. <br />AWARD BID - WESTSIDE NEIGHBORHOOD PARTNERSHIP CENTER - SIDEWALK. CURB <br />AND APPROACH REPAIRS - PROJECT NO. 97-38 <br />Mr. Carl P. Littrell, Director, Division of Engineering, advised the Board that on September 8, 1997, <br />bids were received and opened for the above referred to project. After reviewing those bids, Mr. <br />Littrell recommends that the Board award the contract to Batteast Construction Company, 430 East <br />LaSalle, South Bend, Indiana in the amount of $45,029.00. Therefore, Mr. Littrell made a motion <br />that the recommendation be accepted and the bid be awarded as outlined above. Ms. Roemer <br />seconded the motion which carried. <br />AWARD BID - NEAR NORTHWEST NEIGHBORHOOD PARTNERSHIP CENTER <br />SIDEWALK. CURB AND APPROACH REPAIRS - PROJECT NO. 97-39 <br />Mr. Carl P. Littrell, Director, Division of Engineering, advised the Board that on September 8, 1997, <br />bids were received and opened for the above referred to project. After reviewing those bids, Mr. <br />Littrell recommends that the Board award the contract to Batteast Construction Company, 430 East <br />LaSalle, South Bend, Indiana in the amount of $79,897.00. Therefore, Mr. Caldwell made a motion <br />that the recommendation be accepted and the bid be awarded as outlined above. Ms. Roemer <br />seconded the motion which carried. <br />AWARD BID - RUM VILLAGE PARTNERSHIP CENTER - SIDEWALK, CURB AND <br />APPROACH REPAIRS - PROJECT NO. 97-74 <br />Mr. Carl P. Littrell, Director, Division of Engineering, advised the Board that on September 8, 1997, <br />bids were received and opened for the above referred to project. After reviewing those bids, Mr. <br />Littrell recommends that the Board award the contract to Batteast Construction Company, 430 East <br />LaSalle, South Bend, Indiana in the amount of $91,432.00, which includes the Base Bid plus <br />Alternate. Therefore, Ms. Roemer made a motion that the recommendation be accepted and the bid <br />be awarded as outlined above. Mr. Littrell seconded the motion which carried. <br />AWARD BID - BOWMAN CREEK IMPROVEMENTS - DAYTON STREET TO DUBAIL <br />STREET SEWER IMPROVEMENTS - PROJECT NO. 95-120 <br />Mr. Carl P. Littrell, Director, Division of Engineering, advised the Board that on July 28, 1997, bids <br />were received and opened for the above referred to project. After reviewing those bids, Mr. Littrell <br />recommends that the Board award the contract to HRP Construction, Inc., Post Office Box 266, <br />South Bend, Indiana in the amount of $243,763.16. Therefore, Ms. Roemer made a motion that the <br />recommendation be accepted and the bid be awarded as outlined above. Mr. Littrell seconded the <br />motion which carried. <br />AWARD BID - ONE (1) TRACTOR WITH FLAIL MOWER <br />Mr. Carl P. Littrell, Director, Division of Engineering, advised the Board that on August 18, 1997, <br />bids were received and opened for the above referred to equipment. After reviewing those bids, Mr. <br />Littrell recommends that the Board award the bid to Louis Gelder and Sons, 4704 Territorial Road, <br />Benton Harbor, Michigan in the amount of $35,750.00. Mr. Chlebowski stated that this was not the <br />lowest bidder, and an explanation is listed below: <br />1. The New Holland 5610S Tractor has a hydraulic pump capacity of 9.7 GPM. Our <br />specifications ask for a minimum of 18 GPM. This tractor will be running a 96" rear mower <br />and a 88" side mower, therefore it needs to have a minimum of 18 GPM to run effectively. <br />2. A 96" rear mower is specified, a 90" rear mower was bid. This would cut down on efficiency. <br />3. A bid was not received for a 88" right hand mower. Using a comparable price of another <br />bidder of $11,000 would not make this the low bid received. <br />