REGULAR MEETING SEPTEMEER 15, 1997
<br />AWARD BID - OHIO STREET- MICHIGAN TO CARROLL - SIDEWALK CURB AND
<br />APPROACH AND PAVEMENT REPAIRS - PROJECT NO. 97-36
<br />Mr. Carl P. Littrell, Director, Division of Engineering, advised the Board that on September 8, 1997,
<br />bids were received and opened for the above referred to project. After reviewing those bids, Mr.
<br />Littrell recommends that the Board award the contract to Rieth Riley Construction Co., Inc., Post
<br />Office Box 1775, South Bend, Indiana in the amount of $89,178.85. Therefore, Ms. Roemer made
<br />■ a motion that the recommendation be accepted and the bid be awarded as outlined above. Mr. Littrell
<br />seconded the motion which carried.
<br />AWARD BID - WESTSIDE NEIGHBORHOOD PARTNERSHIP CENTER - SIDEWALK. CURB
<br />AND APPROACH REPAIRS - PROJECT NO. 97-38
<br />Mr. Carl P. Littrell, Director, Division of Engineering, advised the Board that on September 8, 1997,
<br />bids were received and opened for the above referred to project. After reviewing those bids, Mr.
<br />Littrell recommends that the Board award the contract to Batteast Construction Company, 430 East
<br />LaSalle, South Bend, Indiana in the amount of $45,029.00. Therefore, Mr. Littrell made a motion
<br />that the recommendation be accepted and the bid be awarded as outlined above. Ms. Roemer
<br />seconded the motion which carried.
<br />AWARD BID - NEAR NORTHWEST NEIGHBORHOOD PARTNERSHIP CENTER
<br />SIDEWALK. CURB AND APPROACH REPAIRS - PROJECT NO. 97-39
<br />Mr. Carl P. Littrell, Director, Division of Engineering, advised the Board that on September 8, 1997,
<br />bids were received and opened for the above referred to project. After reviewing those bids, Mr.
<br />Littrell recommends that the Board award the contract to Batteast Construction Company, 430 East
<br />LaSalle, South Bend, Indiana in the amount of $79,897.00. Therefore, Mr. Caldwell made a motion
<br />that the recommendation be accepted and the bid be awarded as outlined above. Ms. Roemer
<br />seconded the motion which carried.
<br />AWARD BID - RUM VILLAGE PARTNERSHIP CENTER - SIDEWALK, CURB AND
<br />APPROACH REPAIRS - PROJECT NO. 97-74
<br />Mr. Carl P. Littrell, Director, Division of Engineering, advised the Board that on September 8, 1997,
<br />bids were received and opened for the above referred to project. After reviewing those bids, Mr.
<br />Littrell recommends that the Board award the contract to Batteast Construction Company, 430 East
<br />LaSalle, South Bend, Indiana in the amount of $91,432.00, which includes the Base Bid plus
<br />Alternate. Therefore, Ms. Roemer made a motion that the recommendation be accepted and the bid
<br />be awarded as outlined above. Mr. Littrell seconded the motion which carried.
<br />AWARD BID - BOWMAN CREEK IMPROVEMENTS - DAYTON STREET TO DUBAIL
<br />STREET SEWER IMPROVEMENTS - PROJECT NO. 95-120
<br />Mr. Carl P. Littrell, Director, Division of Engineering, advised the Board that on July 28, 1997, bids
<br />were received and opened for the above referred to project. After reviewing those bids, Mr. Littrell
<br />recommends that the Board award the contract to HRP Construction, Inc., Post Office Box 266,
<br />South Bend, Indiana in the amount of $243,763.16. Therefore, Ms. Roemer made a motion that the
<br />recommendation be accepted and the bid be awarded as outlined above. Mr. Littrell seconded the
<br />motion which carried.
<br />AWARD BID - ONE (1) TRACTOR WITH FLAIL MOWER
<br />Mr. Carl P. Littrell, Director, Division of Engineering, advised the Board that on August 18, 1997,
<br />bids were received and opened for the above referred to equipment. After reviewing those bids, Mr.
<br />Littrell recommends that the Board award the bid to Louis Gelder and Sons, 4704 Territorial Road,
<br />Benton Harbor, Michigan in the amount of $35,750.00. Mr. Chlebowski stated that this was not the
<br />lowest bidder, and an explanation is listed below:
<br />1. The New Holland 5610S Tractor has a hydraulic pump capacity of 9.7 GPM. Our
<br />specifications ask for a minimum of 18 GPM. This tractor will be running a 96" rear mower
<br />and a 88" side mower, therefore it needs to have a minimum of 18 GPM to run effectively.
<br />2. A 96" rear mower is specified, a 90" rear mower was bid. This would cut down on efficiency.
<br />3. A bid was not received for a 88" right hand mower. Using a comparable price of another
<br />bidder of $11,000 would not make this the low bid received.