Laserfiche WebLink
(14 41" <br />REGULAR MEETING <br />Alternates (Per Addendum # 1): <br />Alternate No. 1 - Add For Labor and Materials <br />Alternate No. 6 -Add For Labor and Materials <br />Alternate No. 7 -Add For Labor and Material <br />OCTOBER 26, 1998 <br />$ 3,500.00 <br />$ 2,500.00 <br />$ 3,000.00 <br />EVERGREENE PAINTING STUDIOS. INC. <br />450 W. 31'. Street, 7 h floor <br />New York, New York 10001 <br />Bid was signed by Mr. Jeff Greene, President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: $596,750.00 <br />Voluntary Alternate- Deduct $32,500.00 <br />CONRAD SCHMITT STUDIOS INC <br />2405 South 162" d Street <br />New Berlin, Wisconsin 53151 <br />Bid was signed by Mr. B. Gunar Gruenke, Vice President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted. <br />BID: $1,100,000.00 <br />CHICAGO SPOTLIGHT <br />1658 West Carroll Street <br />Chicago, Illinois 60612 <br />Bid was signed by Mr. Martin S Lazarus, President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted. <br />BID: $472,873.00 <br />TIFFIN SCENIC STUDIOS. INC. <br />146 Riverside Drive, P.O. Box 39 <br />Tiffin, Ohio 44883 <br />Bid was signed by Mr. Brad E Hossler, President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted. <br />BID: $439,244.00 <br />Alternate No. 8 - Additional Stage Rigging Line Sets $ 4,172.00 (per line set) <br />Bid Package 98-25-5.9E - Painting <br />FORSEY CONSTRUCTION. INC. <br />2018 Ironwood Circle <br />South Bend, Indiana 46635 <br />Bid was signed by Mr. F. Thomas Forsey <br />