Laserfiche WebLink
REGULAR MEETING TUESDAY. SEPTEMBER 8, 1998 <br />COLIP ELECTRIC COMPANY <br />714 East LaSalle <br />South Bend, Indiana 46617 <br />Quotation was submitted by Mr. Albert Suter <br />QUOTATION: <br />Ballast Cost Straight Time <br />$ 64.00 <br />Cost Overtime <br />$ 78.00 <br />Cost Double Time <br />$ 93.00 <br />Cost Second Shift <br />$ 70.00 <br />BPS Ballast Cost Straight Time <br />$130.00 <br />Cost Overtime <br />$150.00 <br />Cost Double Time <br />$171.00 <br />Cost Second Shift <br />$138.00 <br />Fuse Cost Straight Time <br />$ 17.00 <br />Cost Overtime <br />$ 21.00 <br />Cost Double Time <br />$ 25.00 <br />Cost Second Shift <br />$ 18.00 <br />Upon a motion made by Ms. Roemer, seconded by Mr. Powell and carried, the above Quotations <br />were referred to the Division of Engineering for review and recommendation. <br />OPENING OF QUOTATIONS - UTILITY CONNECTIONS - SOUTHEAST - PROJECT NO. <br />98-76 <br />Mr. Caldwell advised that this was the date set for the receiving and opening of sealed Quotations <br />for the above referred to project. The following Quotations were opened and read: <br />NIEZGODSKI PLUMBING, INC. <br />Post Office Box 3096 <br />South Bend, Indiana 46619 <br />Quotation was submitted by Mr. David Niezgodski <br />QUOTATION: $17, 800.00 <br />HRP CONSTRUCTION, INC. <br />5777 Cleveland Road <br />South Bend, Indiana 46628 <br />Quotation was submitted by Mr. Paul Fallon <br />QUOTATION: $18,233.00 <br />D&L EXCAVATING INC. <br />12877 Industrial Drive <br />Granger, Indiana 46530 <br />Quotation was submitted by D&L Excavating <br />QUOTATION: $24,221.25 <br />Upon a motion made by Mr. Caldwell, seconded by Ms. Roemer and carried, the above Quotations <br />were referred to the Division of Engineering for review and recommendation. <br />