My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/02/98 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1998
>
03/02/98 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:08:00 PM
Creation date
8/31/2016 2:07:50 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
3/2/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
061 <br />REGULAR MEETING <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: $174,525.00 <br />MARCH 2. 1998 <br />Hidden pipe insulation removal <br />Add $18.50 per linear foot <br />Demolish plaster chase to expose asbestos TSI <br />Add $8.00 per square foot <br />Demolish brick/block to expose asbestos TSI <br />Add $10.00 per square foot <br />Remove ACM plaster <br />Add $10.00 per square foot <br />Remove ACM floor the & mastic <br />Add $2.75 per square foot <br />Remove ACM acoustical plaster <br />Add $15.00 per square foot <br />INSULCO ASBESTOS MANAGEMENT, INC. <br />2840 West Vermont Street <br />Blue Island, Illinois 60406 <br />Bid was signed by Mr. Gary J. Giovanelli, President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: $137,200.00 <br />REGIONAL ENVIRONMENTAL SERVICES, INC. <br />526 West Chicago Avenue <br />East Chicago, Indiana 46312 <br />Bid was signed by Ms. Mary Anne McArdle, President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: $122,000.00 <br />Add $11,814.00 for work on main dome area if the surface is roughened per Addendum 1. Will <br />reopen access port to boiler room to facilitate material removal through alley. Concrete will be <br />returned to as is. <br />AIR MANAGEMENT TECHNIQUES, INC. <br />116 North Madison Street <br />Muncie, Indiana 47305 <br />Bid was signed by Mr. Lennie D. Lowe, Vice President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: $148,525.00 <br />ENVIRONMENT TECHNOLOGY CONSTRUCTING CORPORATION <br />Post Office Box 5513 <br />Fort Wayne, Indiana 46895 <br />Bid was signed by Mr. Donald J. Korte, President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />
The URL can be used to link to this page
Your browser does not support the video tag.