My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Corby Blvd Sidewalk Improvements - JPR
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
PSA - Corby Blvd Sidewalk Improvements - JPR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:11:59 PM
Creation date
8/30/2016 1:58:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/23/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT C, consisting of 4 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services — Lump Sum <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 — OWNER'S RESPONSIBILITIES <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) — Lump Sum <br />Method of Payment <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer's Resident Project Representative, if any, as follows: <br />1. A Lump Sum, Not to Exceed, amount of $46,730.00 based on the following estimated <br />distribution of compensation: <br />a. Topographic Survey $10,225.00 <br />b. Sidewalk Easement (T&E basis) $14,880.00 <br />c. Utility Coordination $1,150.00 <br />d. Conceptual Design $2,750.00 <br />e. Construction Documents and Specifications $15,250.00 <br />f. Bidding and Negotiating Phase —Phase One $650.00 <br />g. Construction Administration — Phase One $1,825.00 <br />2. Engineer may alter the distribution of compensation between individual phases noted herein <br />to be consistent with services actually rendered, but shall not exceed the total Lump Sum <br />amount unless approved in writing by the Owner. <br />3. The Lump Sum includes compensation for Engineer's services and services of Engineer's <br />Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to <br />account for labor, overhead, profit, and Reimbursable Expenses. <br />4. The portion of the Lump Sum amount billed for Engineer's services will be based upon <br />Engineer's estimate of the percentage of the total services actually completed during the <br />billing period <br />B. Allowance: If required, an allowance for the location of private utilities, billed on a Time and <br />Expense basis is as follows: <br />Page I <br />Exhibit C—Compensation Packet BC-1: Basic Services (other than RPR)— Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.