Laserfiche WebLink
Change Order No. 3 <br />East Bank Sewer Separation — Phase 5 <br />114-062 <br />OWNER: City of South Bend <br />ENGINEER: CHA Consulting, Inc. <br />Jay Gibson, P. E. 60920005 <br />Professional Engineer No. PE <br />PROJECT: East Bank Sewer Separation — Phase 5 <br />City Project No. 114-062 <br />SUBJECT: Clarifications and Additions to Construction Documents <br />TO: Contractor <br />ISSUE DATE: July 22, 2016 <br />This Change Order to the Plans and Specifications shall supplement, amend, and become part of these <br />documents. All construction contracts shall incorporate the items addressed in this Change Order. Only the <br />items contained herein are altered. The remainder of the Original Plans and Specifications remain valid in <br />their entirety. <br />The following is a summary and description of the revisions to the Contract by this Change Order: <br />1. Install approximately 320-sft of additional modular block wall between the parking lot and sidewalk <br />south of E Wayne Street between S St Louis Boulevard and S St Peter Street. <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />BIDDING AND CONTRACT REQUIREMENTS: <br />No Change <br />SPECIAL PROVISIONS: <br />No Change <br />PLANS <br />1. Replace Sheets 50, 51 and 77A with the attached revised sheets. <br />BID FORM <br />Modify Line Item No. 133: "MODULAR BLOCK WALL" 906 SFT at$55.00 unit price fora Total Amount <br />of $31,350.00 <br />1 <br />