My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 2 - East Bank Sewer Separation Phase 5 Div B - Proj No 114-062B - Walsh&Kelly
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 2 - East Bank Sewer Separation Phase 5 Div B - Proj No 114-062B - Walsh&Kelly
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:50:42 PM
Creation date
8/30/2016 1:49:23 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/23/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 3 <br />East Bank Sewer Separation — Phase 5 <br />114-062 <br />OWNER: City of South Bend <br />ENGINEER: CHA Consulting, Inc. <br />Jay Gibson, P. E. 60920005 <br />Professional Engineer No. PE <br />PROJECT: East Bank Sewer Separation — Phase 5 <br />City Project No. 114-062 <br />SUBJECT: Clarifications and Additions to Construction Documents <br />TO: Contractor <br />ISSUE DATE: July 22, 2016 <br />This Change Order to the Plans and Specifications shall supplement, amend, and become part of these <br />documents. All construction contracts shall incorporate the items addressed in this Change Order. Only the <br />items contained herein are altered. The remainder of the Original Plans and Specifications remain valid in <br />their entirety. <br />The following is a summary and description of the revisions to the Contract by this Change Order: <br />1. Install approximately 320-sft of additional modular block wall between the parking lot and sidewalk <br />south of E Wayne Street between S St Louis Boulevard and S St Peter Street. <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />BIDDING AND CONTRACT REQUIREMENTS: <br />No Change <br />SPECIAL PROVISIONS: <br />No Change <br />PLANS <br />1. Replace Sheets 50, 51 and 77A with the attached revised sheets. <br />BID FORM <br />Modify Line Item No. 133: "MODULAR BLOCK WALL" 906 SFT at$55.00 unit price fora Total Amount <br />of $31,350.00 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.