ADD ALTERNATE B: ST. LOUIS BOULEVARD AND PART OF WAYNE STREET
<br />Item
<br />No.
<br />Description
<br />Qty
<br />Unit
<br />Unit Price
<br />Total Amount
<br />B1
<br />CONSTRUCTION ENGINEERING
<br />1
<br />LS
<br />$4,500.00
<br />$4,500.00
<br />B2
<br />MOBILIZATION AND
<br />DEMOBILIZATION
<br />1
<br />LS
<br />$6,500.00
<br />$6,500.00
<br />B3
<br />CLEARING RIGHT OF WAY
<br />1
<br />LS
<br />$4,500.00
<br />$4,500.00
<br />64
<br />EXCAVATION, COMMON
<br />80
<br />CYS
<br />$22.00
<br />$1,760.00
<br />B5
<br />CURB, CONCRETE, REMOVE
<br />1,130
<br />LFT
<br />$2.00
<br />$2,260.00
<br />B6
<br />CONCRETE, REMOVE
<br />1,360
<br />SYS
<br />$4.00
<br />$5,440.00
<br />B7
<br />PAVEMENT REMOVAL
<br />315
<br />SYS
<br />$6.00
<br />$1,890.00
<br />B8
<br />STRUCTURE, REMOVE
<br />1
<br />EA
<br />$250.00
<br />$250.00
<br />B9
<br />B BORROW
<br />230
<br />CYS
<br />$7.50
<br />$1,725.00
<br />B10
<br />TEMPORARY EROSION AND
<br />SEDIMENT CONTROL
<br />1
<br />LS
<br />$4,500.00
<br />$4,500.00
<br />B11
<br />FLOWABLE BACKFILL, NON -
<br />REMOVABLE
<br />2
<br />CYS
<br />$250.00
<br />$500.00
<br />B12
<br />COMPACTED AGGREGATE, NO. 53,
<br />BASE
<br />30
<br />TON
<br />$20.00
<br />$600.00
<br />B13
<br />MILLING, ASPHALT, 2.5 IN
<br />2,950
<br />SYS
<br />$2.00
<br />$5,900.00
<br />B14
<br />HMA SURFACE, TYPE B
<br />250
<br />TON
<br />$68.00
<br />$17,000.00
<br />B15
<br />HMA FOR PATCHING
<br />50
<br />TON
<br />$75.00
<br />$3,750.00
<br />B16
<br />HMA WEDGE AND LEVEL, TYPE B
<br />162
<br />TON
<br />$65.00
<br />$10,530.00
<br />B17
<br />ASPHALT FOR TACK COAT
<br />1
<br />TON
<br />$15.00
<br />$15.00
<br />B18
<br />CURB RAMP, CONCRETE, G
<br />30
<br />SYS
<br />$145.00
<br />$4,350.00
<br />B19
<br />SIDEWALK, CONCRETE, 4 IN.
<br />1,315
<br />SYS
<br />$30.00
<br />$39,450.00
<br />B20
<br />CURB, MODIFIED, CONCRETE
<br />934
<br />LFT
<br />$22.00
<br />$20,548.00
<br />B21
<br />PCCP FOR APPROACHES, 6 IN.
<br />35
<br />SYS
<br />$50.00
<br />$1,750.00
<br />B22
<br />PCCP FOR APPROACHES, 8 IN.
<br />934
<br />SYS
<br />$52.00
<br />$48,568.00
<br />B23
<br />SODDING
<br />1,320
<br />SYS
<br />$4.52
<br />$5,966.40
<br />B24
<br />PIPE, TYPE 2, CIRCULAR, 12 IN.
<br />53
<br />LFT
<br />$34.00
<br />$1,802.00
<br />B25
<br />ADJUST CASTING TO GRADE
<br />5
<br />LFT
<br />$350.00
<br />$1,750.00
<br />B26
<br />ADJUST VALVE BOX TO GRADE
<br />10
<br />EA
<br />$35.00
<br />$350.00
<br />B27
<br />INLET B-15
<br />1
<br />EA
<br />$2,800.00
<br />$2,800.00
<br />B28
<br />MANHOLE, C4, MODIFIED
<br />1
<br />EA
<br />$2,600.00
<br />$2,600.00
<br />B29
<br />MANHOLE, J15, MODIFIED
<br />1
<br />EA
<br />$4,800.00
<br />$4,800.00
<br />B30
<br />MAINTAINING TRAFFIC
<br />1
<br />LS
<br />$3,500.00
<br />$3,500.00
<br />B31
<br />SIGN POST, SQUARE, TYPE 2,
<br />REINFORCED ANCHOR BASE
<br />15
<br />LFT
<br />$9.72
<br />$145.80
<br />B32
<br />SIGN, SHEET, WITH LEGEND 0.080"
<br />12
<br />SFT
<br />$16.75
<br />$201.00
<br />B33
<br />SIGN AND POST, REMOVE
<br />2
<br />EA
<br />$85.00
<br />$170.00
<br />Bidder's Name
<br />Version 5/26/2016 Contractor's Bid for Public Works - 17 CHANGE ORDER NO. 1
<br />
|