Laserfiche WebLink
71 <br />MANHOLE, J4, MODIFIED <br />2 <br />EA <br />$4,000.00 <br />$8,000.00 <br />72 <br />MANHOLE, J15, MODIFIED <br />25 <br />EA <br />$5,100.00 <br />$127,500.00 <br />73 <br />MANHOLE, K2, MODIFIED <br />1 <br />EA <br />$6,000.00 <br />$6,000.00 <br />74 <br />MANHOLE, K4, MODIFIED <br />4 <br />EA <br />$5,200.00 <br />$20,800.00 <br />75 <br />MANHOLE, K15, MODIFIED <br />4 <br />EA <br />$6,600.00 <br />$26,400.00 <br />76 <br />MANHOLE, L4, MODIFIED <br />1 <br />EA <br />$11,000.00 <br />$11,000.00 <br />MANHOLE, K4, MODIFIED WITH <br />77 <br />BAFFLE AND 3 FT. SUMP <br />1 <br />EA <br />$5, 500.00 <br />$5,500.00 <br />7-8 <br />MANHOLE, i n MOD o cn WITH <br />RAvo F AND o yr SUMP <br />FA <br />DELETED <br />DELETED <br />79 <br />STRUCTURE RECONSTRUCTION <br />3 <br />EA <br />$5,000.00 <br />$15,000.00 <br />80 <br />OUTFALL, STRUCTURE NO. 1, 30 IN, <br />1 <br />EA <br />$76,000.00 <br />$76,000.00 <br />81 <br />OUTFALL, STRUCTURE NO. 2,48 IN. <br />1 <br />EA <br />$82,000.00 <br />$82,000.00 <br />82 <br />RIP -RAP, REVETMENT <br />39 <br />TON <br />$125.00 <br />$4,875.00 <br />$.3 <br />RQGK WALL,HAND n ORTA RFD <br />&T <br />DELETED <br />DELETED <br />84 <br />GEOTEXTILE FABRIC <br />59 <br />SYS <br />$4.00 <br />$236.00 <br />85 <br />SANITARY MANHOLE, REMOVE <br />14 <br />EA <br />$205.00 <br />$2,870.00 <br />SANITARY SEWER, 8 IN. PVC SDR- <br />86 <br />35 <br />2,380 <br />LFT <br />$23.00 <br />$54,740.00 <br />SANITARY SEWER, 10 IN. PVC SDR- <br />87 <br />35 <br />290 <br />LFT <br />- $24.99 <br />$7,247.10 <br />SANITARY SEWER, 12 IN. PVC SDR- <br />88 <br />35 <br />298 <br />LFT <br />$26.00 <br />$7,748.00 <br />SEWER, 15 IN. PVC SDR- <br />89 <br />35SANITARY <br />8 <br />LFT <br />$100.00 <br />$800.00 <br />SANITARY SEWER, 18 IN. PVC SDR- <br />90 <br />35 <br />32 <br />LFT <br />$85.00 <br />$2,720.00 <br />SANITARY SEWER LATERAL, 6 IN, <br />91 <br />NEW CONNECTION <br />1571 <br />LFT <br />$28.00 <br />$43,988.00 <br />92 <br />ennnrn ov conivo i nrooni c IN, <br />o TAIR ooi ACEM&IT <br />LET <br />DELETED <br />DELETED <br />CIPP LINING, 10 IN., LESS THAN 10 <br />93 <br />FT. DEEP <br />647 <br />LFT <br />$33.09 <br />$21,409.23 <br />CIPP LINING, 12 IN., LESS THAN 10 <br />94 <br />FT. DEEP <br />457 <br />LFT <br />$49.38 <br />$22,566.66 <br />CIPP LINING, 15 IN., LESS THAN 10 <br />95 <br />FT.DEEP <br />243 <br />LFT <br />$57.23 <br />$13,906.89 <br />CIPP LINING, 12 IN., 10 FT. TO 15 <br />96 <br />FT. DEEP <br />1,683 <br />LFT <br />$54.25 <br />$91,302.75 <br />CIPP LINING, 15 IN., 10 FT. TO 15 <br />97 <br />FT. DEEP <br />460 <br />LFT <br />$57.35 <br />$26,381.00 <br />CIPP LINING, 18 IN., 10 FT. TO 15 <br />98 <br />FT, DEEP <br />1,382 <br />LFT <br />$62.45 <br />$86,305.90 <br />Bidder's Name <br />Version 5/25/2016 Contractor's Bid for Public Works - 10 CHANGE ORDER NO. 1 <br />